Construction site report 04. week (24. - 30.01.2022)

21.01.2022

Here is the current roadworks report for the 4th calendar week of 2022.

Unless otherwise indicated, cyclists and passers-by will pass the roadworks.

New roadworks

  • None


Finished roadworks

  • None


Existing roadworks

"Bridge in front of the Neutor"

  • Type: Complete closure
  • Duration: until 30.04.2022
  • Reason: New construction of the bridge
  • Traffic will be diverted as follows:
    • out of town via Erbertstraße - Ernst-Haeckel-Straße
    • into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
  • Details: From 17.01.2022, the ramp leading to the Paradies will be fully closed - pedestrians and cyclists using this access route will be guided past by detour signs.

Buchenweg

  • Type: Half-sided closure
  • Location: House number 34
  • Duration: until 12.07.2022
  • Reason: Construction site installation for the conversion of the adjacent school
  • Details: Waiting is compulsory for vehicles meeting in the carriageway area.

Dornburger Straße

  • Type: Complete closure
  • Location: from the junction with Schützenhofstraße to the junction with An der Eule
  • Duration: until 30.06.2022
  • Reason: Civil engineering works
  • Details: The current closure area extends from Dornburger Straße 105 -135. A detour will be signposted.
  • Please note: This road section will be open to traffic again by 28.01.2022. Weather permitting, road construction work will resume from 28.01.2022.

Emil-Wölk-Straße (bus stop)

  • Type: Half-sided closure
  • Location: Karl-Marx-Allee level with Emil-Wölk-Straße (towards the traffic circle)
  • Duration: until 31.03.2022
  • Reason: New construction of bus stop
  • Details: Traffic will be diverted via Stauffenbergstraße.

Hornstraße

  • Type: Complete closure
  • Duration: until 31.01.2022
  • Reason: Renovation of the "Dornröschen" daycare center
  • Details: Pedestrians can pass.

Karl-Liebknecht-Straße

  • Type: One-sided footpath closure
  • Location: House number 34-44
  • Duration: until 28.01.2022
  • Reason: Civil engineering works
  • Details: Pedestrians will be diverted to the opposite side of the footpath.

Kollegiengasse

  • Type: Complete closure
  • Location: between Nonneplan and Löbderstraße
  • Duration: until 30.04.2022
  • Reason: Civil engineering works
  • Details: A detour will be signposted. In this context, a search excavation will also be carried out on Eichplatz next to the Neue Mitte.
  • Attention: The closure will be partially lifted by 21.01.2022 so that safe passage is guaranteed again.

Naumburger / Altenburger Straße

  • Type: Complete closure
  • Duration: until 28.01.2022
  • Reason: Work on the district heating pipeline
  • Details: A detour will be signposted. Pedestrians can pass the construction site safely.

Oberaue

  • Type: Complete closure
  • Location: House number 20 to the Lichtenhainer bridge
  • Duration: until 18.02.2022
  • Reason: Work on the high-pressure gas pipeline
  • Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.
  • We would like to take this opportunity to clearly point out that moving or removing traffic signs and traffic facilities constitutes a dangerous interference with road traffic. The above-mentioned area is controlled. Traffic signs (e.g. detour signs) are for orientation purposes and must remain in place.