Construction site report 09.KW (28.02. - 06.03.2022)
Here is the current roadworks report for the 09th calendar week 2022.
Unless otherwise stated, cyclists and passers-by will pass the roadworks.
New construction sites
Eichplatz
- Type: Partial closure
- Duration: on Monday, 28.02.2022, 17.00 - 22.00 hrs
- Reason: Demonstration
Finished construction sites
None
Existing construction sites
"Bridge in front of the Neutor"
- Type: Complete closure
- Duration: until 30.04.2022
- Reason: New construction of the bridge
- Traffic will be diverted as follows:
- out of town via Erbertstraße - Ernst-Haeckel-Straße
- into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
- Details: Underpass to Paradies fully closed - detour signposted
Buchenweg
- Type: Half-sided closure
- Location: House number 34
- Duration: until 12.07.2022
- Reason: Construction site installation for the conversion of the adjacent school
- Details: Waiting is compulsory for vehicles meeting in the carriageway area.
Dornburger Straße
- Type: Complete closure
- Location: from the junction with Friedrich-Wolf-Straße to the junction with An der Eule
- Duration: until 30.06.2022
- Reason: Civil engineering works
- Details: A detour will be signposted. Pedestrians can pass the construction site safely.
Emil-Wölk-Straße (bus stop)
- Type: Closure on one side
- Location: Karl-Marx-Allee at Emil-Wölk-Straße (towards the traffic circle)
- Duration: until 31.03.2022
- Reason: New construction of bus stop
- Details: Traffic will be diverted via Stauffenbergstraße.
Hornstraße
- Type: Complete closure
- Duration: until 31.03.2022
- Reason: Renovation of the "Dornröschen" daycare center
- Details: Pedestrians can pass.
Karl-Liebknecht-Straße
- Type: Complete closure
- Location: House number 34-44
- Duration: until 01.04.2022
- Reason: Civil engineering works
- Details: Pedestrians will be diverted to the opposite sidewalk.
Kollegiengasse
- Type: Complete closure
- Location: between Nonnenplan and Löbderstraße
- Duration: until 30.04.2022
- Reason: Civil engineering works
- Details: A detour will be signposted. In this context, a search excavation will also be carried out on Eichplatz next to Neue Mitte.
- Attention: The closure will be partially lifted until 04.03.2022 so that safe passage is guaranteed.
Kunitzer Straße - Jenzigweg underpass
- Type: Complete closure
- Location: Tunnel
- Duration: until 04.03.2022
- Reason: Development of the new residential area "Erlenhöfe construction project with supply lines
- Details: Pedestrians and cyclists using this access route will be guided past by detour signs.
Jena North
- Type: Complete closure
- Duration: until 11.03.2022
- Details: During this period, there will be 3 traffic restrictions at the following locations.
- In Rautal, at the level of the drinking water tank, there will be a full closure. A detour will be signposted.
- Furthermore, the sidewalk area in Closewitzer Straße will be fully closed due to construction work. An emergency pedestrian route will be set up on the road to allow pedestrians to pass safely.
- At the same time, Ottogerd-Mühlmann-Straße will be closed on one side and the adjacent footbridge will be fully closed. An emergency pedestrian route will also be set up here and a pedestrian detour will be signposted.
Oberaue
- Type: Complete closure
- Location: House number 20 to the Lichtenhainer bridge
- Duration: until 31.03.2022
- Reason: Work on the high-pressure gas pipeline
- Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.
- We would like to take this opportunity to clearly point out that moving or removing traffic signs and traffic facilities constitutes a dangerous interference with road traffic. The above-mentioned area is controlled. Traffic signs (e.g. detour signs) are for orientation purposes and must remain in place.
Schützenhofstraße
- Type: Half-sided closure
- Location: House number 74-78
- Duration: until 01.07.2022
- Reason: Construction site installation for a block of flats
- Details: Pedestrians can pass safely.