Construction site report 12th week (21. - 27.03.2022)

18.03.2022

Here is the current roadworks report for the 12th calendar week of 2022.

Unless otherwise indicated, cyclists and passers-by will pass the roadworks.

New construction sites

Blochmannstraße

  • Type: Complete closure
  • Duration: 21.03. - 17.06.2022
  • Reason: Renewal of the supply lines
  • Details: A detour will be set up on site.

Eichplatz

  • Type: Partial closure
  • Duration: Monday, 21.03.2022, 17.00 - 22.00 hrs
  • Reason: Demonstration

Finished construction sites

  • None


Existing construction sites

"Bridge in front of the Neutor"

  • Type: Complete closure
  • Duration: until 30.04.2022
  • Reason: New construction of the bridge
  • Traffic will be diverted as follows:
    • out of town via Erbertstraße - Ernst-Haeckel-Straße
    • into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
  • Details: Underpass to Paradies fully closed - detour signposted

Brändströmstraße and Gabelsbergerstraße

  • Type: Full closure
  • Location: Gabelsbergerstraße and Brändströmstraße intersection area
  • Duration: until 17.06.2022
  • Reason: Renewal of the sewage pipes
  • Details: Brändströmstraße Hnr. 13 to 20 - coming fromKarl-Günther-Straße- will be signposted as a dead end. The lower part of Brändströmstraße is requiredas a storage area. Pedestrians can pass the construction site safely.

Buchenweg

  • Type: Half-sided closure
  • Location: House number 34
  • Duration: until 12.07.2022
  • Reason: Construction site installation for the conversion of the adjacent school
  • Details: Waiting is compulsory for vehicles meeting in the carriageway area.

Dornburger Straße

  • Type: Complete closure
  • Location: from the junction with Friedrich-Wolf-Straße to the junction with An der Eule
  • Duration: until 30.06.2022
  • Reason: Civil engineering works
  • Details: A detour will be signposted. Pedestrians can pass the construction site safely.

Emil-Wölk-Straße (bus stop)

  • Type: Closure on one side
  • Location: Karl-Marx-Allee at Emil-Wölk-Straße (towards the traffic circle)
  • Duration: until 31.03.2022
  • Reason: New construction of bus stop
  • Details: Traffic will be diverted via Stauffenbergstraße.

Hornstraße

  • Type: Complete closure
  • Duration: until 22.04.2022
  • Reason: Renovation of the "Dornröschen" daycare center
  • Details: Pedestrians can pass.

Karl-Liebknecht-Straße

  • Type: Complete closure
  • Place: House number 34 - 44
  • Duration: until 01.04.2022
  • Reason: Civil engineering works
  • Details: Pedestrians will be diverted to the opposite sidewalk.

Kollegiengasse

  • Type: New installation of the full closure
  • Location: between Nonnenplan, Löbderstraße and along the Neue Mitte
  • Duration: until 25.05.2022
  • Reason: Civil engineering works
  • Details: A detour is signposted. Access to Eichplatz is possible.

Kunitzer Straße - Jenzigweg underpass

  • Type: Complete closure
  • Duration: until 29.04.2022
  • Reason: Laying of supply lines for the adjacent "Erlenhöfe" construction project
  • Details: A detour for pedestrians is signposted.

Oberaue

  • Type: Complete closure
  • Location: House number 20 to the Lichtenhainer bridge
  • Duration: until 31.03.2022
  • Reason: Work on the high-pressure gas pipeline
  • Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.
  • We would like to take this opportunity to clearly point out that moving or removing traffic signs and traffic facilities constitutes a dangerous interference with road traffic. The above-mentioned area is controlled. Traffic signs (e.g. detour signs) are for orientation purposes and must remain in place.

Schützenhofstraße

  • Type: Half-sided closure
  • Location: House number 74-78
  • Duration: until 01.07.2022
  • Reason: Construction site installation for the conversion of the adjacent apartment block
  • Details: Pedestrians can pass safely.

Announcements

Dorfstraße (Jena Wogau)

  • Type: Complete closure in 3 construction phases
  • Duration: 28.03. - 29.07.2022
  • Reason: Crane installation
  • 1st construction phase: Dorfstraße between the Wilhelm-Hauff-Weg / Dorfstraße / Im Tiefen Weg intersection
  • 2nd construction phase: Dorfstraße in the area of the fork in Tiefen Weg
  • 3rd construction phase: Dorfstraße from B7 to the junction with Im Tiefen Weg

Winzerlaer Straße

  • Type: Complete closure
  • Duration: 29.03.2022 from 6:00 am to 31.03.2022, 6:00 pm
  • Reason: Crane installation
  • A detour is signposted as follows:
    • out of town via Hermann-Löns-Straße and Rudolstädter Straße
    • into the city via Rudolstädter Straße - Kahlaische Straße - Ernst-Haeckel-Straße - Westbahnhofstraße - Magdelstieg and Tatzendpromenade