The construction site report for the 27th calendar week
Finished construction sites
- At the Volksbad, half-sided closure lifted
- Stadtrodaer Straße in Lobeda, complete closure in the area of the bridge between Lobeda-Ost and Lobeda-West lifted
Existing locks
- Bernhard-Schultze-Straße, full closure between Am Steinborn and the junction with Julius-Schaxel-Straße, reason: civil engineering work on supply lines, until August 27
- Camburger Straße, half-sided closure, reason: laying of gas pipes, until mid-July 2019
During the construction period, road traffic in the direction of the city center will remain on Camburger Straße. Northbound traffic will be routed back to Camburger Straße via Spitzweidenweg and Scharnhorststraße. - Am Eisenbahndamm, narrowing of the road, reason: laying of a drinking water pipeline through the railroad embankment between Landveste and Straße am Eisenbahndamm, until July 26
During the construction work, the cycle/walking path will be closed in the area of the construction site at Landveste and rerouted in the area of Landveste. There will also be a temporary narrowing of the road Am Eisenbahndamm, especially at times when traffic is lighter, as one of the two left-turn lanes in the direction of Paradiesbrücke (Stadtrodaer Straße) will have to be shortened slightly.
- Engelplatz, closure of the parking lot, reason: Preparation and realization of the Kulturarena, until 28 August
- Hufelandweg, sectional closure between Am Nordfriedhof 7 and Thomas-Mann-Straße, reason: laying of new gas and house connection pipes, until September 30
Detour via Ricarda-Huch-Weg to Philosophenweg and Kritzegraben. - County road K 8 between Isserstedt and Lützeroda, short-term closures, reason: tree felling and pruning measures, until the beginning of July
- Lichtenhainer Oberweg, full closure between the Carl-Zeiss-Promenade junction and the Döbereinerstrasse junction, until June 28
Detour via the adjacent streets Phillip-Müller-Straße; Döbereinerstraße; Friedrich-Körner-Straße. - Lutherplatz/ Inselplatz, closure of approx. 1/3 of the parking lot, reason: archaeological excavations, until September 20
- Marktstraße in Lobeda-Altstadt, sectional closure, reason: expansion of Marktstraße between Marktplatz and Nikolaus-Theiner-Straße and further via Lobdeburgweg between Stadtgraben and Spitzbergstraße, until September 27
- Max-Wien-Platz, traffic space restrictions in the area where Kritzegraben joins Philosophenweg, reason: development of the property at Am Philosophenweg 26, until the middle of the year
A construction site traffic light regulates the traffic. - Mittelstraße, full closure, reason: renewal of the sewer between Otto-Schott-Straße and Kronfeldstraße, until August 30
It is possible to drive around the construction site via the adjacent roads. - Naumburger Straße / Rautal, full closure of the Naumburger Straße / Am Steinbach intersection, reason: expansion of Naumburger Straße between Camburger Straße and Flurweg
The large-scale detour is via Brückenstraße - Wiesenstraße - Am Anger and back.Despite the barriers in Brückenstraße: Please do not try to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority.
- Rautalstrasse, full closure, reason: laying of new drinking water pipes between Kuithanstrasse and Ottogerd-Mühlmann-Strasse
In the fall of this year, this new drinking water pipeline is to be laid in the Rautal further to the end of Jena in the direction of Closewitz.
Detour via Kuithanstraße, Zitzmann-Straße, Straße and Ottogerd-Mühlmann-Straße or G.-Neumann-Straße.
- Schrödingerstraße 8-18, half-sided closure, reason: renovation work on the adjacent building, until November 8
- Stifterstraße, complete closure, reason: laying of a new drinking water pipe, until July 31
- Westbahnhofstraße 2a to 6a, one-sided closure in the area of the retaining wall, reason: retaining wall renovation, until September 29
If there is a traffic jam into the city, the construction site can be bypassed via Rathenaustraße - Curt-Unckel-Straße - Hainstraße and An der Brauerei.
Announcements
-
Narrowing of Lutherplatz
From July 8 to August 9, a new water pipe will be laid in the roadway at Lutherplatz between Saalbahnhofstraße and the Am Anger junction. For this purpose, the right-hand lane leading from the Anger junction to Saalbahnhofstraße will have to be closed throughout. Traffic obstructions are to be expected.
As planned, the Am Anger road between the Anger junction and K.-Kollwitz-Straße will be closed to vehicle traffic from July 19 to July 22. It is recommended to drive around the construction area on this weekend via K.-Kollwitz-Straße and Bibliotheksplatz.
The parking lot at Lutherplatz 3 opposite Hotel Schwarzer Bär cannot be used by residents during the entire construction period. It is recommended to park on the east side of the street Am Anger between Steinweg and Angerkreuzung.
-
Full closure of Merseburger Straße
-
On 11.07.2019 and 12.07.2019, there will be a full closure in Merseburger Straße because the existing tower crane there has to be dismantled. The road can also be accessed from Zeitzer Straße during the closure period.
-
Complete closure of Teichgraben
The originally planned half-sided closure of Teichgraben for the laying of the drinking water pipeline is not possible for health and safety reasons. A full closure is required in the period from 08.07.2019 to 16.08.2019. The road traffic authorities have issued the following stipulations:- Replacement stops for the bus will be designated in the Grietgasse area immediately east of Neugasse and between Am Volksbad and Paradiesstraße (wooden platform on the parking lane).
- Bus route 16 will be routed from Holzmarkt via Nonnenplan and Kollegiengasse to Leutragraben.
- The traffic light system in the Engelplatz area will be adapted to the changed traffic conditions by KSJ.
- Closures for the renewal of the surface course
- Ernst-Abbe-Straße 15.07.2019 to 02.08.2019
- Jenaer Straße / Cospeda 05.08.2019 to 16.08.2019
- J.-R.-Becher-Str. 19.08.2019 to 30.08.2019
- Göschwitzer Str. 30.09.2019 to 18.10.2019
- Stauffenbergstraße 21.10.2019 to 01.11.2019
- W.-Seelbenbinder-Straße 16.09.2019 to 27.09.2019