Construction site report for the 39th calendar week of 2019 (September 23 - 29)
Finished construction site
- Hufelandweg
Sectional closure of Hufelandweg between Am Nordfriedhof 7 and Thomas-Mann-Straße from 24.06.2019 to 20.09.2019 - Leutragaben 4
On 18.09.2019 and 19.09.2019, work was carried out on the building using a crane. Thismade it necessary to close one side of the Leutragraben.
New construction sites
- Neugasse, full closure at house number 6, reason: removal, from September 23, 08:00 a.m.
Neugasse can only be accessed by motor vehicles from both directions as a dead end, the one-way street regulation will be lifted. A detour will be signposted for motor vehicles via Grietgasse, Am Volksbad. Pedestrians and cyclists will not be diverted. Both types of traffic can continue to use Neugasse in both directions.
- Stadtrodaer Straße, full closure, reason: dismantling of the formwork, main bridge inspection and installation of lighting, September 24, 9:00 am to September 27, 6:00 pm.
Traffic will be diverted into the city via the traffic circle at the Fair Resort Hotel and Erlanger Allee through Lobeda-Ost. Traffic will be diverted towards the highway via the Lobeda-West access ramp and straight back onto Stadtrodaer Straße.
At the junction with Karl-Marx-Allee, traffic must be regulated by roadworks traffic lights.
The full closure is already widely signposted in both directions, so that the bypass from the highway or from the city via Burgau and Göschwitz should already partially relieve the closed junction. At busy times of the day, there will be temporary obstructions due to the full closure.
Existing locks
- Camburger Straße, half-sided closure between Leipziger Straße and Scharnhorststraße, reason: laying of drinking water pipe, until the end of December
- Initially, Camburger Straße will be closed on one side from Scharnhorststraße in the direction of the Aral petrol station and traffic will be diverted into the city via Dornburger Straße and Scharnhorststraße.
- Full closure of the Camburger-Straße / Scharnhorststraße intersection during the fall vacations (October 7 to 19). The detour will be via Dornburger Straße and Nollendorfer Platz in both directions.
- Löbdergraben 1, half-sided closure, reason: renovation work at the bus stop, until October 4
The half-side closure will be implemented by means of one-way traffic control in the direction of Teichgraben. Road users who want to drive in the direction of Löbdergraben must drive around the roadworks via Holzmarkt and Grietgasse or Knebelstraße.
- Am Kieshügel, closure, reason: laying of service pipes, until September 27
Traffic will be diverted locally. The detour will be signposted. The closure is necessary in order to lay pipes in the roadway.
- Lutherplatz/ Inselplatz, closure of approx. 1/3 of the parking lot, reason: archaeological excavations
- Marktstraße in Lobeda-Altstadt, sectional closure, reason: expansion of Marktstraße between Marktplatz and Nikolaus-Theiner-Straße and further via Lobdeburgweg between Stadtgraben and Spitzbergstraße, until September 27
- Naumburger Straße / Rautal, full closure, reason: expansion of Naumburger Straße between Camburger Straße and Flurweg
- The large-scale detour is via Brückenstraße - Wiesenstraße - Am Anger and back.
- Despite the barriers in Brückenstraße: Please do not attempt to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority.
- Rautalstraße, full closure including the Closewitzer Straße junction up to the entrance to Jena from the direction of Closewitz, reason: laying of new drinking water pipes, until September 27
- The Rautal-Closewitzer Straße junction will be open to vehicle traffic again from September 27.
- Rautalstraße from Closewitzer Straße to the entrance to Jena from the direction of Closewitz will remain closed until November 29.
- Schrödingerstraße between Bertold-Brecht-Straße and Hugo-Schrade-Straße, closure, reason: surface renovation, until October 18
The closure will take place in two construction phases in order to preserve as many parking spaces as possible. During the closure period, traffic will be diverted via H.-Schrade-Straße, the detour will be signposted.
- Schrödingerstraße 8-18, one-sided closure, reason: renovation work on the adjacent building, until November 8
(Will be temporarily lifted during the renovation of the road surface). - Stadtrodaer Straße, half-side closure, reason: construction of an additional access road to the stadium site from Stadtrodaer Straße, until May 30, 2020
This new access road is located to the south of the current stadium access road, approximately at the level of the Saale cycle path crossing over the streetcar tracks. In order to create this new access road, it will be necessary to close one side of Stadtrodaer Straße in this new access area several times during the above-mentioned period. The Saale cycle path will also be closed in this area.
Detour for motorists: It is planned to route traffic via the opposite directional lane during these periods. The necessary crossings across the central reservation of Stadtrodaer Straße have already been constructed.
Cyclist detour: A detour will be in place in both directions via Unterdorfstraße near Wöllnitz, Wöllnitzer Straße, Am Stadion to the Saale cycle path at the entrance to the stadium. The traffic light regulations at the crossings of Stadtrodaer Straße will also be adjusted.
- Tatzendpromenade and Magdelstieg, full closure, reason: fundamental renewal of Magdelstiege from Gustav-Fischer-Straße to Tatzendpromenade and Tatzendpromenade from Magdelstieg to Lichtenhainer Straße, until June 2020
- The construction project is being carried out in two phases. The 1st construction phase is between Gustav-Fischer-Straße and Bertold-Koch-Platz.
- The detour is via Otto-Schott-Straße.
- Westbahnhofstraße 2a to 6a, one-sided closure in the area of the retaining wall, reason: retaining wall renovation, until September 29
- If there is a traffic jam into the city, the roadworks can be bypassed via Rathenaustraße - Curt-Unckel-Straße - Hainstraße and An der Brauerei.
Announcements
- Closures for surface course renewal:
- Göschwitzer Str. September 30 to October 18
- Stauffenbergstraße October 21 to November 1, 2019