Construction site report 3rd week (17. - 23.01.2022)
Here is the current roadworks report for the 3rd calendar week of 2022.
Unless otherwise indicated, cyclists and passers-by will pass the roadworks.
New roadworks
-
None
Finished roadworks
-
None
Existing roadworks
"Bridge in front of the Neutor"
- Type: Complete closure
- Duration: until 30.04.2022
- Reason: New construction of the bridge
- Traffic will be diverted as follows:
- out of town via Erbertstraße - Ernst-Haeckel-Straße
- into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
- Details: From 17.01.2022, the ramp leading to the Paradies will be fully closed - pedestrians and cyclists using this access route will be guided past by detour signs.
Buchenweg
- Type: Half-sided closure
- Location: House number 34
- Duration: until 12.07.2022
- Reason: Construction site installation for the conversion of the adjacent school
- Details: Waiting is compulsory for vehicles meeting in the carriageway area.
Dornburger Straße
- Type: Complete closure
- Location: from the junction with Schützenhofstraße to the junction with An der Eule
- Duration: until 30.06.2022
- Reason: Civil engineering works
- Details: The current closure area extends from Dornburger Straße 105 -135. A detour will be signposted.
-
Please note: This road section will be open to traffic again by 28.01.2022. Weather permitting, road construction work will resume from 28.01.2022.
Emil-Wölk-Straße (bus stop)
- Type: Half-sided closure
- Location: Karl-Marx-Allee level with Emil-Wölk-Straße (towards the traffic circle)
- Duration: until 31.03.2022
- Reason: New construction of bus stop
- Details: Traffic will be diverted via Stauffenbergstraße.
Hornstraße
- Type: Complete closure
- Duration: until 31.01.2022
- Reason: Renovation of the "Dornröschen" daycare center
- Details: Pedestrians can pass.
Karl-Liebknecht-Straße
- Type: One-sided footpath closure
- Location: House number 34-44
- Duration: until 28.01.2022
- Reason: Civil engineering works
- Details: Pedestrians will be diverted to the opposite side of the footpath.
Kollegiengasse
- Type: Complete closure
- Location: between Nonneplan and Löbderstraße
- Duration: until 30.04.2022
- Reason: Civil engineering works
- Details: A detour will be signposted. In this context, a search excavation will also be carried out on Eichplatz next to the Neue Mitte.
- Attention: The closure will be partially lifted by 21.01.2022 so that safe passage is guaranteed again.
Naumburger / Altenburger Straße
- Type: Complete closure
- Duration: until 28.01.2022
- Reason: Work on the district heating pipeline
- Details: A detour will be signposted. Pedestrians can pass the construction site safely.
Oberaue
- Type: Complete closure
- Location: House number 20 to the Lichtenhainer bridge
- Duration: until 18.02.2022
- Reason: Work on the high-pressure gas pipeline
- Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.
- We would like to take this opportunity to clearly point out that moving or removing traffic signs and traffic facilities constitutes a dangerous interference with road traffic. The above-mentioned area is controlled. Traffic signs (e.g. detour signs) are for orientation purposes and must remain in place.