The construction site report for the 43rd calendar week
Finished construction site
- Westbahnhofstraße, support wall renovation is complete
- Camburger Straße, construction work completed - but road markings cannot be made until October 21
- Maurerstraße open again
New construction sites
- Karl-Liebknecht-Straße, traffic restrictions in the area of the Jena-Ost streetcar terminus,
On Monday, 21.10.2019, and possibly also on 22.10.2019, a new rectifier substation for the streetcar power supply will be installed by crane in the area of the Jena-Ost streetcar terminus. For this purpose, the K.-Liebknecht-Straße carriageway will be closed and traffic will be alternately diverted over the streetcar tracks. An asphalt surface will be laid over the tracks from 14.10.2019 to 18.10.2019 so that the tracks can be driven on safely.
Traffic will alternate over the streetcar tracks. To ensure that the tracks can be driven on safely, an asphalt surface will be laid over the tracks from October 14 to 18. - Stauffenbergstraße, closure, reason: surface layer renewal, October 21 to November 1, 2019
- Complete closure of Scheidlerstraße
From 21.10.2019 to 07.11.2019, Scheidlerstraße will be closed to vehicle traffic in the area of house no. 22 and 51/53. Pedestrians will be guided along the construction site. The closure is necessary because service pipes have to be laid here. Vehicular traffic will be diverted and the detour will be signposted.
Existing locks
- Göschwitzer Straße, closures, reason: renewal of surface course, until October 30
The construction work is taking place in the area of the Göschwitz industrial estate.The old road surface will be removed between September 30 and October 11, 2019. Göschwitzer Straße will become a one-way street from Prüssingstraße to the southern junction of Ernst-Ruska-Ring, which can only be driven on in the direction of Burgau. Two-way traffic will be diverted via Lobedaer Straße and Rudolstädter Straße. The same traffic regulations will apply when the final work on the road construction site is completed - between October 21 and 30, 2019
The surface course will be laid in two consecutive construction phases, each of which will require a full closure of Göschwitzer Straße. Traffic will be diverted in both directions via Lobedaer Straße and Rudolstädter Straße.
1st construction phase October 12 to 14
Full closure between the southern junction of Ernst-Ruska-Ring and Fr.- Hundt-Straße.2nd construction phase October 19 to 21
Full closure between the southern junction of Prüssingstraße and Fr.-Hundt-StraßePedestrians and cyclists will not be diverted. They can use the sidewalk along the construction site.
- Karl-Liebknecht-Straße 150 - Half-sided closure
A new power supply for the streetcar is being installed in the area of the Jena-Ost streetcar terminus . This will require a half-sided road closure of Bundesfernstraße 7 in the construction site area from 14.10.2019 to 13.12.2019. Traffic will be guided alternately with a traffic light system. - Lutherplatz/ Inselplatz, closure of approx. 1/3 of the parking lot, reason: archaeological excavations
- Lutherstraße half-sided closure
From 14.10.2019 to 08.11.2019, Lutherstraße will be closed on one side in the area of house no. 78. A detour is not necessary. - Naumburger Straße / Rautal, full closure, reason: expansion of Naumburger Straße between Camburger Straße and Flurweg
- The large-scale detour is via Brückenstraße - Wiesenstraße - Am Anger and back.
- Despite the barriers in Brückenstraße: Please do not try to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority.
- Neugasse 29 full closure
For the construction of house connection pipes, Neugasse in the area of house no. 29 will be fully closed to vehicle traffic from October 25, 2019. The one-way traffic regulationwill be lifted. Neugasse will be accessiblefrom both directions up to the construction site. Pedestrians and cyclists can pass the work site and will not be diverted. - Rautalstraße, full closure west of the Closewitzer Straße junction up to the entrance to Jena from the direction of Closewitz, reason: laying of new drinking water pipes and renewal of the road surface, until November 29
- Stadtrodaer Straße, half-sided closure, reason: construction of an additional access road to the stadium grounds from Stadtrodaer Straße, until May 30, 2020
- This new access road is located to the south of the current stadium access road, approximately at the level of the Saale cycle path crossing over the streetcar tracks. In order to create this new access road, it will be necessary to close one side of Stadtrodaer Straße in this new access area several times during the above-mentioned period. The Saale cycle path will also be closed in this area.
- Detour for motorists: It is planned to divert traffic via the opposite lane during these periods. The necessary crossings across the central reservation of Stadtrodaer Straße have already been constructed.
- Cyclist detour: A detour will be made in both directions via Unterdorfstraße near Wöllnitz, Wöllnitzer Straße, Am Stadion to the Saale cycle path at the entrance to the stadium. The traffic light regulations at the crossings of Stadtrodaer Straße will also be adjusted.
-
Schrödingerstrasse
Closure between Bertold-Brecht-Straße and Hugo-Schrade-Straße, reason: road surface renovation, until October 25
The closure will be carried out in two construction phases in order to preserve as many parking spaces as possible. During the closure period, traffic will be diverted via H.-Schrade-Straße and signs will be posted to indicate the detour.
- Tatzendpromenade and Magdelstieg, full closure, reason: fundamental renewal of Magdelstiege from Gustav-Fischer-Straße to Tatzendpromenade and Tatzendpromenade from Magdelstieg to Lichtenhainer Straße, until June 2020
- The construction project is being carried out in two phases. The 1st construction phase is between Gustav-Fischer-Straße and Bertold-Koch-Platz.
- The detour is via Otto-Schott-Straße.
Switching off traffic light systems
- Numerous traffic light systems are currently being converted and the traffic light control systems are being revised. This makes it necessary to temporarily shut down these systems.
The following shutdowns will take place soon: - 21.10.2019 Erlanger-Allee / Carolinenstraße
- 22.10. and 23.10.2019 Erlanger Allee / R.-Breitscheid-Straße
Announcements
- Traffic obstructions due to the installation of new road surfaces
From 23.10.2019, new road surfaces approximately 2 cm thick will be laid on the following roads in order to improve the durability of the road surfaces. This will result in temporary traffic obstructions (approx. 30 minutes) as the new road surface will only be passable after 30 minutes.
The roads will be worked on one after the other. During the road construction work, there will be an absolute ban on stopping in the road sections concerned.The following road sections are affected:
- Lützerodaer Straße
- Reinlandstraßeparking lot
- Fritz-Krieger-Straße from Naumannstraße to Ebertstraße
- Schaefferstrasse
- Okenstraße from Mittelstraße to R.-Härzer-Straße
- Kötschauweg
- Kirchstraße