Construction site report 43rd week

22.10.2021

Unless otherwise indicated, cyclists and pedestrians will pass the roadworks.

FINISHED CONSTRUCTION SITES

Dornburger Straße

  • Replacement of the pipe networks has been completed.

Philosophenweg

  • Damage has been repaired.

Rautal

  • Tree felling work has been completed.

NEW ROAD CLOSURES

Friedrich-Engels-Straße

  • Type: Half-sided closure
  • Location: House number 9
  • Duration: 25.10. - 05.11.2021
  • Reason: Dismantling of a gas pipe

Ottogerd-Mühlmann-Straße

  • Type: Complete closure
  • Place: House number 1-8
  • Duration: 25.10. - 05.11.2021
  • Reason: Renewal of the surface course
  • Details: A detour will be signposted on site.

EXISTING CONSTRUCTION SITES

"Bridge in front of the Neutor"

  • Type: Complete closure
  • Duration: until 17.12.2021
  • Reason: New construction of the bridge
  • Traffic will be diverted as follows
    • out of town via Erbertstraße - Ernst-Haeckel-Straße
    • into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
  • Details: The ramp leading into the Paradies is closed - pedestrians and cyclists will be guided past by detour signs. Access to the street "An der Brauerei" is possible from Kahlaische Straße. The exit via Felsenkellerstraße and Alexander-Puschkin-Platz is also possible.

Buchenweg

  • Type: Half-sided closure
  • Location House number 34
  • Duration: until 12.07.2022
  • Reason: Construction site installation for the conversion of the adjacent school
  • Details: Waiting is compulsory for vehicles meeting in the carriageway area.

Camburger Straße

  • Type: One-sided footpath closure
  • Location: House number 64c - 68
  • Duration: until 29.10.2021
  • Reason: Cable laying
  • Details: Pedestrians will be diverted to the opposite side of the footpath

Camsdorfer Straße (traffic trial)

  • Type: Extension of the traffic trial
  • Details: In order to relieve traffic on Camsdorfer Straße, additional traffic organization measures have been implemented on Camsdorfer Ufer since the beginning of March. These consist of the opening of the Camsdorfer Ufer in both directions, including the section between "Geleitshaus" and "Grüner Tanne". In addition, a crossing aid for pedestrians will be installed in the "Camsdorfer Straße / Karl-Liebknecht-Straße" area so that this junction can be crossed more safely.

Dornburger Straße (3x)

  • Type: Complete closure
  • Location: between Scharnhoststraße and the southern Schützenhofstraße junction
  • Duration: until 30.11.2021
  • Reason: Laying of media and house connections
  • Details: The construction site can be bypassed via the adjacent road network. During this period, replacement stops will be set up in Camsdorfer Straße and Altenburger Straße.
  • Type: Complete closure
  • Location: from the junction with Schützenhofstraße to the junction with An der Eule
  • Duration: until 30.06.2022
  • Reason: Civil engineering works
  • Details: A detour will be signposted. From 17.10.2021, the bus will run again as scheduled via Schützenhofstraße in the direction of Closewitzer Straße
  • Type: Closure on one side
  • Duration: until 29.10.2021
  • Location: at the height of Spittelplatz
  • Reason: Work on the drinking water pipeline
  • Details: Traffic is controlled via one lane in alternating trafficusing traffic lights. This requires the traffic island at Spittelplatz/Spitzweidenweg and the central lane at Am Anger to be built over. Traffic can enter Spitzweidenweg via Nollendorfer Straße and Clara-Zetkin-Straße; the measure is necessary to extend and connect the drinking water pipeline at Spittelplatz.

Emil-Wölk-Straße

  • Type: Half-sided closure
  • Location: Karl-Marx-Allee level with Emil-Wölk-Straße (towards the traffic circle)
  • Duration: until 03.12.2021
  • Reason: New construction of bus stop
  • Details: Traffic will be diverted via Stauffenbergstraße.

Hornstraße

  • Type: Complete closure
  • Duration: until 31.12.2021
  • Reason: Renovation of the "Dornröschen" daycare center
  • Details: Pedestrians can pass.

Kahlaische Straße

  • Type: Closure on one side
  • Location: At the height of Alexander-Puschkin-Platz
  • Duration: until 26.11.2021
  • Reason: Work on the drinking water pipeline
  • Traffic will be diverted as follows
    • out of town via Sellierstraße - Hainstraße
    • Kahlaische Straße is regularly passableon the way into town

Karl-Liebknecht-Straße

  • Type: One-sided footpath closure
  • Location: House number 34-44
  • Duration: until 30.11.2021
  • Reason: Civil engineering works
  • Details: Pedestrians will be diverted to the opposite side of the footpath

Moritz-Seebeck-Straße

  • Type: Complete closure
  • Location: Döbereinerstraße / Moritz-Seebeck-Straße junction area
  • Duration: until 05.11.2021
  • Reason: Redesign of the traffic facilities/pipes
  • Details: The road will be fundamentally upgraded from the Tatzendpromenade junction up to and including the Döbereinerstraße intersection.
    Those concerned will be informed by the construction company with up-to-date information, e.g. where to place waste disposal containers. A detour will be set up on site.

Oberaue

  • Type: Complete closure
  • Location: House number 20 to the Lichtenhainer bridge
  • Duration: until 23.12.2021
  • Reason: Work on the high-pressure gas pipeline
  • Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.
  • We would like to take this opportunity to clearly point out that moving or removing traffic signs and traffic facilities constitutes a dangerous interference with road traffic. The above-mentioned area is controlled. Traffic signs (e.g. detour signs) are for orientation purposes and must remain in place.

Scharnhorststraße

  • Type: Complete closure
  • Location: between Camburger Straße and Spitzweidenweg
  • Duration: until 29.10.2021
  • Reason: Work on the drinking water pipeline
  • Details: The entrance to Spitzweidenweg can be made via Clara-Zetkin-Straße during this time. For this purpose, the current direction of travel of the one-way street will be reversed so that it is possible to enter from Camburger Straße in the direction of Spitzweidenweg. The exit from Spitzweidenweg is possible via Nollendorfer Straße.

Schrödingerstraße

  • Type: Complete closure
  • Duration: until 05.11.2021
  • Reason: 3rd construction phase - road surface renovation
  • Details: The bypass for private traffic is via Oßmaritzer Straße and Bertolt-Brecht-Straße.

Spitzweidenweg

  • Type: Complete closure
  • Location: between Spittelplatz and Nollendorfer Straße
  • Duration: until 03.12.2021
  • Reason: Replacement of the drinking water pipeline
  • Details: The construction site can be bypassed via the adjacent road network. During this period, replacement stops will be set up in Camsdorfer Straße and Altenburger Straße.
    Current traffic routing: The originally installed half-sided closure is expected to be converted into a full closure until 29.10.2021. Residents will be granted access.

Wiesenstraße

  • Type: Half-sided closure
  • Location: At house number 2
  • Duration: until 12.11.2021
  • Reason: Expansion of the property access road

Zwätzengasse

  • Type: Complete closure
  • Place: House number 6
  • Duration: until 29.10.2021
  • Reason: Demolition work
  • Details: Pedestrian traffic can pass the construction site

ANNOUNCEMENTS

Work on the Deutsche Bahn track network

  • Location: between Jena and Stadtroda
  • Duration: 03 - 10.11.2021
  • Reason: Construction work to maintain operational safety
  • Details: The construction work must also be carried out at night and on Sundays for reasons of railroad operations.