The construction site report for the 6th calendar week
Here is the current roadworks report for the 6th calendar week of 2023 (06.02. - 12.02.202).
Unless otherwise stated, you can walk or cycle past the construction sites.
FINISHED CONSTRUCTION SITES
Lichtenhainer Straße
Complete closure ended
NEW ROADWORKS / CLOSURES
Forest road
- Type: Complete closure
- Place: House number 35a
- Duration: 08. to 09.02.2023
- Reason: Crane dismantling
- Details: The construction site can be passed safely on foot.
Fürstengraben
- Type: Half-sided closure
- Location: Junction with Bibliotheksplatz to before the junction with Johannisplatz
- Duration: 06. to 17.02.2023
- Reason: Work on the sidewalk
- Details: A one-way street will be set up. Inbound traffic will be diverted (see image for detour plan). Pedestrians will be guided safely past the construction site.

Umleitungsplan: Bauarbeiten Fürstengraben Januar/ Februar 2023
© Stadt Jena
EXISTING CONSTRUCTION SITES
Buchenweg
- Type: Half-sided closure
- Location: House number 34
- Duration: until 30.07.2023
- Reason: Construction site installation for the conversion of the adjacent school
- Details: Waiting is compulsory for vehicles meeting in the carriageway area.
Goldberg tunnel
- Type: Full closure for cyclists and pedestrians
- Duration: until 28.02.2023 (17:00)
- Reason: Safety measures in the tunnel
- Details: A detour is signposted. Pedestrians and cyclists please use the newly created footpath/cycle path.
Julius-Schaxel-Straße
- Type: Complete closure
- Duration: until 31.03.2023
- Reason: Road expansion incl. pipe laying
- Details: The construction site can be passed on foot. There will be 3 construction phases.
Keßlerstraße
- Type: Temporary restrictions
- Duration: until 17.02.2023
- Reason: Civil engineering work for laying fiber optic cables
Lessingstraße
- Type: Complete closure
- Location: House number 1 to 6
- Duration: until 28.02.2023
- Reason: Laying of district heating pipe
- Details: The area can be passed on foot and by bike
- Addition: During the winter break (start 19.12.2022 - end not yet known), Lessingstraße will be passable by one-way traffic.
Lobeda-Altstadt - Neulobeda - Drackendorf
- Type: Restrictions
- Duration: until 24.02.2023
- Reason: Civil engineering work for laying fiber optic cable
Max-Gräfe-Gasse
- Type: Partial closure
- Location: Corner of Kreuzgasse
- Duration: until 31.03.2023
- Reason: Construction site installation for house conversion
- Details: The construction site can be passed.
Oberaue
- Type: Complete closure
- Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
- Duration: until 31.03.2023
- Reason: Work on the stadium grandstand
- Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.
Thomas-Münzer-Weg
- Type: Complete closure
- Location: House number 4
- Duration: until 30.06.2023
- Reason: Construction of a residential building
- Details: The full closure is indicated by means of planning boards from both Jägerbergstraße and Max-Gräfe-Gasse. The restricted area must be driven around extensively. The construction site can be safely passed on foot and by bike.
To the Ziskauer Valley (Lützeroda)
- Type: Complete closure
- Duration: until 28.04.2023
- Reason : Civil engineering works (sewage; drinking water)
- Details: A detour will be signposted on site.
ANNOUNCEMENT