The construction site report for week 11 (13 - 19.03.2023)

10.03.2023

Here is the current roadworks report for the 11th calendar week (13 - 19.03.2023).

Unless otherwise stated, you can walk or cycle past the roadworks.

FINISHED CONSTRUCTION SITES

Brückenstraße level crossing

  • Complete closure is finished.

Keßlerstraße

  • Temporary restrictions have ended.

NEW CONSTRUCTION SITES / CLOSURES

Johannisstraße

  • Type: Restrictions
  • Location: Junction with Jenergasse to Johannisstaße 17
  • Duration: 15.03.2023 to 05.05.2023
  • Reason: Media relocation
  • Details: Pedestrians can pass the construction site safely.

Schützenhofstraße

  • Type: Closure on one side
  • Location: At house number 66
  • Duration: 15.03.2023 to 28.04.2023
  • Reason: Civil engineering works
  • Details: Pedestrians will be guided safely past the construction site. Cyclists must dismount during the construction period.

Closure of the level crossing

During the closure of the level crossing, the road will be fully closed so that no road users can pass the level crossing.

Mühlenstraße

  • Type: Full closure
  • Duration: 16.03.2023 (8:00 a.m.) to 17.03.2023 (06:00 a.m.) and 25.03.2023 (6:00 a.m.) to 26.03.2023 (6:00 a.m.)
  • Reason: Work on the track system and the level crossing
  • Details: The tunnel at Rasenmühleninsel serves as a detour for pedestrians and cyclists.

EXISTING CONSTRUCTION SITES

Closure of level crossing

During the closure of the level crossing, the road will be fully closed so that no road users can pass the level crossing.

Am Steinbach

  • Type: Full closure
  • Duration: 10.03.2023 (8:00 a.m.) to 15.03.2023 (06:00 a.m.)
  • Reason: Work on the track system and the level crossing
  • Details: The adjacent tunnel serves as a detour for pedestrians and cyclists. A detour will be signposted. The detour for motorized private traffic is via Brückenstraße.

Buchenweg

  • Type: Half-sided closure
  • Location House number 34
  • Duration: until 30.07.2023
  • Reason: Construction site installation for the conversion of the adjacent school
  • Details: Waiting is compulsory for vehicles meeting in the carriageway area.

Fürstengraben

  • Type: Closure on one side
  • Location: Junction with Bibliotheksplatz up to the junction with Johannisplatz
  • Duration: until 24.03.2023
  • Reason: Work on the sidewalk
  • Details: A one-way street will be set up. Inbound traffic will be diverted (see appendix for detour plan). Pedestrians will be guided safely past the construction site.
Umleitungsplan: Bauarbeiten Fürstengraben Januar/ Februar 2023
Umleitungsplan: Bauarbeiten Fürstengraben Januar/ Februar 2023

Julius-Schaxel-Straße

  • Type: Complete closure
  • Location: Entrance to local traffic to Göschwitzer Straße junction (Fiebig car dealership)
  • Duration: until 31.03.2023
  • Reason: Road expansion incl. pipe laying
  • Details: The construction site can be passed on foot. There will be 3 construction phases. Construction phases 2 + 3 will take place in 2023.

Lessingstraße

  • Type: Complete closure
  • Location: House number 8-10
  • Duration: until 26.05.2023
  • Reason: Laying of drinking water pipe
  • Details: From 13.03.23 to 26.05.23 Lessingstraße is not accessible from the direction of Am Steiger. Fröbelstieg can only be approached from Philosophenweg.

Lindenhöhe

  • Type: Complete closure
  • Duration: until 05.05.2023
  • Reason: Civil engineering works
  • Details: The construction site can be passed safely on foot.

Drackendorf

  • Type: Temporary restrictions
  • Duration: until 17.03.2022
  • Reason: Civil engineering work for laying fiber optic cable

Max-Gräfe-Gasse

  • Type: Partial closure
  • Location: Corner of Kreuzgasse
  • Duration: until 31.03.2023
  • Reason: Construction site installation for house conversion
  • Details: The construction site can be passed.

Münchenrodaer Grund

  • Type: Half-sided closure
  • Duration: until 17.03.2023
  • Reason: Tree maintenance work
  • Details : Traffic will be guided past the roadworks by means of mobile traffic lights.

2X Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
  • Duration: until 31.03.2023
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.
  • Type: Closure of partial areas
  • Location: From the main stadium access road to Roland-Ducke-Weg
  • Duration: until 04.08.2023
  • Reason: Expansion of the road and ancillary facilities
  • Details: Access to the Oberaue will always be possible. In the first construction phase, work is currently underway from the main stadium access road to just before the Roland-Ducke-Weg junction. The construction site can be passed, but obstructions are to be expected. Cyclists can bypass the construction site safely and quickly. A detour has been set up and signposted for this purpose.

Thomas-Münzer-Weg

  • Type: Complete closure
  • Location House number 4
  • Duration: until 30.06.2023
  • Reason: Construction of a residential building
  • Details: The full closure is indicated by means of planning boards from both Jägerbergstraße and Max-Gräfe-Gasse. The restricted area must be driven around extensively. The construction site can be safely passed on foot and by bike.

To the Ziskauer Valley (Lützeroda)

  • Type: Complete closure
  • Duration: until 28.04.2023
  • Reason : Civil engineering works (sewage; drinking water)
  • Details: A detour will be signposted on site.

ANNOUNCEMENT

Berthold-Delbrück-Straße

  • Type: Half-sided closure
  • Duration: 27.03.2023 to 28.04.2023
  • Reason: Civil engineering works
  • Details: Traffic will be guided past the construction site by means of one-way traffic control (direction of travel into the city). Pedestrians can pass the construction site safely.

Dammstrasse

  • Type: Complete closure
  • Duration: 20.03.2023 to 30.05.2023
  • Reason: Renewal of pipelines and traffic facilities
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.

1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße

Erlanger Allee - cycle path connection between Lobeda-Ost and Lobeda-West

  • Type: Closure of sections and path connections
  • Location: between Theobald-Renner-Str. and Kastanienstraße junction and in the opposite direction
  • Duration: 20.03.2023 to 29.02.2024
  • Reason: Construction of a cycle path connection
  • Details: In the first construction phase, the roadway will be closed on one side and the pedestrian crossing at Platanenstraße to Paul-Schneider-Straße will be fully closed. A detour for pedestrians and cyclists via Kastanienstraße/Klinikum will be signposted.

Löbichauer Straße

  • Type: Full closure
  • Duration: 20.03.2023 to 24.03.2023
  • Reason: Civil engineering works
  • Details: Pedestrians and cyclists can pass the construction site safely.

Spitzweidenweg

  • Type: Closure on one side
  • Location: from the junction with Scharnhorststraße to the old goods station
  • Duration: 27.03.2023 to 28.04.2023
  • Reason: Civil engineering works
  • Details: Traffic will be guided past the construction site by means of one-way traffic control (direction of travel into the city). Pedestrians can pass the construction site safely.