The construction site report for week 39 (25.09. - 01.10.2023)

22.09.2023

Here is the current roadworks report for the 39th calendar week (25.09. - 01.10.2023).

Unless otherwise stated, you can walk or cycle past the roadworks.

COMPLETED CONSTRUCTION SITES

Am Steinborn

  • Civil engineering works are finished.

Junlius-Schaxel-Straße

  • Road construction including pipe laying is complete.

NEW CONSTRUCTION SITES / ROAD CLOSURES

B7 - Eisenberger Straße

  • Type: Half-sided closure
  • Location: Eisenberger Straße
  • Duration: 25.09. to 29.09.2023
  • Reason: Civil engineering works and setting of road kerbs
  • Details: Traffic will be controlled by mobile traffic lights.

Kahlaische Straße

  • Type: Half-sided closure
  • Location: At house number 14
  • Duration: 25.09. to 29.09.2023
  • Reason: Repair of the fault on the gas pipeline
  • Details: Traffic will be controlled by mobile traffic lights. Pedestrians can pass the construction site safely. The construction work has an impact on streetcar line 2 between Jena-Ost and Winzerla. The following stops can therefore not be served: Felsenkeller, Mühlenstraße, Ringwiese and Enver-Simsek-Platz. Further information is available at www.stadtwerke-jena.de/nahverkehr.

Schützenhofstraße

  • Type: Half-sided closure
  • Location: from house number 101/ 103 to the junction with Naumburger Straße
  • Duration: 25.09. to 17.11.2023
  • Reason: Renovation of the drinking water pipeline
  • Details: Pedestrians will be safely diverted on site.

EXISTING CONSTRUCTION SITES

Am Erlkönig

  • Type: Complete closure
  • Location: up to Talstein nursery
  • Duration: until approx. 10.11.2023
  • Reason: Development of the local heating network for the emerging "Erlenhöfe" residential area
  • Details: Access via the Saaleradweg is possible again. The detour for garden residents is via Kunitz.

Ammerbacher Straße

  • Type: Half-sided closure
  • Duration: until 13.10.2023
  • Reason: Civil engineering works

Am Steinborn

  • Type: Half-sided closure
  • Location: At house number 130
  • Duration: until 20.10.2023
  • Reason: Energy renovation of a house
  • Details: Pedestrians and cyclists can pass the area safely.

Dammstraße

  • Location: Magnus-Poser-Straße to Schenkstraße (1st construction phase)
  • Type: Complete closure
  • Duration: until 30.05.2024
  • Reason: Renewal of pipelines and traffic facilities
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.

1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße

Erlanger Allee - cycle path connection between Lobeda-Ost and Lobeda-West

  • Type: Closure of sections and path connections
  • Location: between Theobald-Renner-Str. and Kastanienstraße junction and in the opposite direction
  • Duration: until 29.02.2024
  • Reason: Construction of a cycle path connection
  • Details: In the first construction phase, the carriageway will be closed on one side and the pedestrian crossing at Platanenstraße to Paul-Schneider-Straße will be fully closed.
  • Attention: The southern ramp in the direction of Karl-Marx-Allee in the direction out of town (A4/ Stadtroda) is expected to be closed until 29.09.2023. A detour is signposted on site.

Sidewalk closure

  • Location: From Lutherplatz/corner of Saalbahnhofstraße to Dornburger Straße 52
  • Duration: until 30.09.2023
  • Reason: Installation/conversion of catenary masts
  • Details: For the most part, the construction site can be passed safely on foot. If there is a complete closure of the pavement, pedestrians and cyclists will be diverted accordingly on site.

Border road

  • Type: Half-sided closure
  • Location: At house number 2-4
  • Duration: until 01.03.2024
  • Reason: Construction of an apartment building
  • Details: Pedestrians will be guided safely past the construction site by means of an emergency pedestrian route.

Jägerbergstraße

  • Type: Complete closure
  • Location: in the direction of Schafberg
  • Duration: until 13.10.2023
  • Reason: Installation of medium-voltage cable
  • Details: Detour signs will be posted on site.

Kunitz

  • Type: Temporary restrictions
  • Duration: until approx. 27.10.2023
  • Reason: Continuation of civil engineering work for fiber optic expansion
  • Details: There will be restrictions in the areas of Lange Straße, Kirchstraße, An der Schule, An der Mühle, Kunitzer Hintergasse, Auf der Gebind, Kunitzburgweg and Im Linsenland.

Lobeda old town

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 30.11.2023
  • Reason: Civil engineering work for laying fiber optic cable
  • Details: The construction site can be passed safely on foot.

Lobeda East and Illmnitz

  • Type: Temporary half-sided closure + footpath closure
  • Duration: until 30.09.2023
  • Reason: Civil engineering work for laying fiber optic cable
  • Details: The construction site can be passed safely on foot.

Löbichauer Straße

  • Type: Complete road closure
  • Location: Lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
  • Duration: until 31.12.2023
  • Reason: Civil engineering works
  • Details: The construction site can be passed safely on foot.

Nollendorfer Straße

  • Type: Complete closure
  • Location: between Thomas-Mann-Straße and Dornburger Straße
  • Duration: until 30.12.2023
  • Reason: Major road renovation

2x Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
  • Duration: until 23.12.2023
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.
  • Type: Closure of partial areas
  • Location: From the main stadium access road to Roland-Ducke-Weg
  • Duration: until 30.11.2023
  • Reason: Expansion of the road and ancillary facilities
  • Details: The construction site can be passed, but obstructions are to be expected. Cyclists can bypass the construction site safely and quickly. A detour has been set up and signposted for this purpose.
  • ADDITION: In the area of the main access road toOberaue, the out-of-town lane on Stadtrodaer Straße will be closed due to construction work . The closure will take place from Monday to Friday. Road users who are traveling out of town and want to turn right into Oberaue will first be diverted on Stadtrodaer Straße via: Jenaplan - Wöllnitzer Straße and Am Stadion to Oberaue .

Rautal

  • Type: Half-sided closure
  • Location: from the junction with Erich-Kuithan-Straße to the junction with Ottoger-Mühlmann-Straße
  • Duration: until 13.12.2023
  • Reason: Asphalt work + construction of new sidewalk
  • Details: Furthermore, a full road closure will be installed in connection with this construction measure during the fall vacations (02. - 13.10.2023).

Remderoda

  • Type: Complete closure
  • Location: Road in the direction of Remderoda
  • Duration: until 30.05.2024
  • Reason: Laying of drinking water pipe
  • Details: A detour via Münchenroda will be signposted.

Sandweg

  • Type: Complete closure
  • Place: House number 4-8
  • Duration: until 24.11.2023
  • Reason: Renewal of the district heating pipeline
  • Details: The construction site can be passed safely on foot.

Schloßgasse

  • Type: Complete closure
  • Location: Main entrance to the university to the junction with Saalstraße
  • Duration: until 31.10.2023
  • Reason: Renewal of the sewer
  • Details: The construction site can be passed safely on foot.

Stauffenbergstraße

  • Type: Complete closure
  • Location: from the junction with Werner-Seelenbinder-Straße to the junction with Fregestraße
  • Duration: until 14.10.2023
  • Reason: Surface course renewal
  • Details: The road will be fully closed in 3 construction phases. Access to the residential area is ensured. Detour signs will be set up on site.

Schützenhofstraße stairs

  • Type: Complete closure
  • Location: At house number 81
  • Duration: until 13.10.2023
  • Reason: Staircase demolition and new construction
  • Details: Pedestrians can use the stairs between Ottogerd-Mühlmann-Straße and Closewitzer Straße.

Weigelstraße

  • Type: Complete closure
  • Duration: until 30.09.2023
  • Reason: Replacement of district heating pipes
  • Details: Access to Jenergasse and Hinter der Kirche street is still possible during the construction period

Winzerlaer Straße

  • Type: Sectional half-sided closures
  • Location: in the area from Buchaer Straße to Mühlenstraße
  • Duration: until 22.12.2023
  • Reason: Connection changes to the Fichtlerwiesen / cable work
  • Details: The construction work will be carried out in 8 construction phases at intervals of approx. 170m. Traffic will be guided alternately by means of mobile construction site traffic lights. The client is Satdtwerke Jena.

Wöllnitz

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 30.09.2023
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Ziegenhain

  • Type: Temporary restrictions
  • Duration: until 30.09.2023
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

To the Ziskauer valley (Lützeroda)

  • Type: Complete closure
  • Duration: until 27.10.2023
  • Reason: Civil engineering works (sewage; drinking water)
  • Details: A detour will be signposted on site.

ANNOUNCEMENTS

B7

  • Type: Complete closure
  • Location: between the junction Vor der Gembdenmühle and the Jena Wogau town entrance sign
  • Duration: 02.10. to 16.10.2023
  • Reason: surface course installation
  • Details: Large-scale detour will be set up for heavy traffic. Only regular bus services and local residents can use the nearby detour. This runs via the following roads:
  • out of town: Vor der Gembdenmühle - Löbichauer Straße - Über der Viehtreibe - Hinter dem Dorfe - Am Tanzsaal - Dorfstraße
  • into town: Dorfstraße - Friedhofsweg - Über der Viehtreibe - Löbichauer Straße - Vor der Gembdenmühle
  • ADDITION: From 25.09.2023 to 29.09.2023 there will be a half-sided closure on Eisenberger Straße by means of mobile traffic lights. During the construction period, civil engineering work will be carried out and kerbs installed.

Saalebrücke - Lobedaer Straße

  • Type: Half-sided closure
  • Location: on the Saalebrücke bridge
  • Duration: 09.10. to 13.10.2023
  • Reason: Repair of damaged areas in the pavement
  • Details: Traffic will be controlled by mobile traffic lights.