
The Jena construction site report for the 10th calendar week (03 - 09.03.2025)
Unless otherwise indicated, you can get past the roadworks on foot and by bike.
New closures / obstructions
Buchaer Straße
- Type: Half-sided closure
- Location: At house number 16
- Duration: 03.03. - 25.04.2025
- Reason: Work on the drinking water pipeline
- Details: The area can be passed safely on foot.
Scharnhorststraße
- Type: Half-sided closure
- Location: between the junctions with Camburger Straße and Spitzweidenweg
- Duration: 05.03. - 17.04.2025
- Reason: Civil engineering works
- Details: Traffic will be guided in the direction of Spitzweidenweg by means of one-way traffic control. The bus service out of town will run via Nollendorfer Straße and Camburger Straße. The Saalbahnhof bus stop (heading out of town) will be relocated to Camburger Straße. Towards the city center, the regular bus service will run via Spitzweidenweg and serve the Saalbahnhof stop there.
Closures completed
None
Existing closures
Carl-Zeiß-Platz
- Type: Complete closure
- Location: House numbers 12 - 14
- Duration: until 29.08.2025
- Reason: Renovation and new construction of the German Optical Museum
Dammstraße
- Type: Complete closure
- Duration: until 30.06.2025
- Reason: Laying of pipes and renewal of the road surface
- Details: A detour will be signposted. The construction work is divided into two construction phases:
1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße
2x Dornburger Straße
- Type: Half-sided closure + sidewalk closure
- Location: between Nordschule and An der Eule
- Duration: until 30.04.2025
- Reason: Reconstruction of the streetcar catenary system
- Type: Various closures
- Location: House number 6
- Start: 19.06.2024
- Reason: New house construction
- Addition: From 06.01.2025 to 31.10.2025, a one-way road (half-sided closure, driving direction into the city) will be set up in the area of Dornburger Straße 6. The closure will be used for loading and unloading and as a construction site facility. Out-of-town traffic will be diverted via Spitzweidenweg and Nollendorfer Straße.
Ernst-Abbe-Platz
- Duration: until 30.04.2025
- Reason: Construction work in the track area
- Details: Crossing facilities for pedestrians will be set up.
Grenzstraße
- Type: Complete closure
- Location: Junction with Geraer Straße up to the railroad bridge
- Duration: until 30.04.2025
- Reason: Major roadworks
- Details: A detour will be signposted.
Isserstedter Straße
- Type: Complete closure
- Location: from house number 21 to the junction with Zum Ziskauer Tal
- Duration: The work in the entire district of Lützeroda will last until the end of 2025
- Reason: Fundamental road expansion
- Details: The detour will be signposted.
Church square
- Type: Traffic restrictions
- Location: Around the town church
- Duration: until 30.05.2025
- Reason: extensive construction work
- Details: Access to the town church will be guaranteed during the entire construction period. Saalstraße will be fully closed for transit/delivery traffic.
Lessingstraße
- Type: Complete closure
- Location: between Fröbelstieg and Max-Wien-Platz
- Duration: until 31.12.2025
- Reason: Civil engineering works and construction site transportation
- Details: The construction site can be bypassed via Helmholtzweg.
Löbdergraben, eastern footpath
- Type: Complete closure
- Location: between Steinweg and Lutherplatz
- Duration: until 28.03.2025
- Reason: Roadworks and media relocation
- Details: Pedestrians will be diverted to the opposite sidewalk.
Rudolf-Breitscheid-Straße
- Type: Complete closure
- Location: At house numbers 8 - 30
- Duration: until 24.04.2025
- Reason: Reconstruction of wastewater sewer
Schroeterstraße
- Type: Complete closure
- Location: from Strigelstraße to Forstweg
- Duration: until 30.05.2025
- Reason: Fundamental road expansion
- Details: During the construction period there is no connection to Katharinenstraße.
Wiesenstraße, traffic circle
- Duration: until 29.11.2025
- Reason: fundamental redesign
- Details: Access to Kunitz and the adjacent industrial estate is only possible via Brückenstraße, but not via Wiesenstraße. A wide detour is signposted via Am Anger - Dornburger Straße - Camburger Straße. An emergency footpath to Kunitz and in the direction of Naumburger Straße leads past the roadworks.
Announcements
Stadtrodaer Straße
- Type: Closure of one lane
- Location: opposite the access road to the A4 towards Frankfurt/Main
- Duration: 11.03.2025, 09:00 to 16:00
- Reason: Repair of two defective manhole covers
- Details: Traffic will be diverted past the construction site.
Kategorie