Jena construction site report for the 10th calendar week (04 - 10.03.2024)

01.03.2024

Unless otherwise indicated, you can get past the roadworks on foot and by bike.

New closures / obstructions

B7

  • Type: Half-sided closure
  • Location: between the "Vor der Gembdenmühle" junction and the Jena exit sign
  • Start: 04.03.2024
  • Reason: Road surface renovation incl. sidewalk construction
  • Details: Traffic will be guided past the construction site by means of a mobile traffic light system

Fritz-Reuter-Straße

  • Type: Full road closures in sections
  • Duration: 04.03. - 12.04.2024
  • Reason: Reconstruction of the combined sewer

Naumburger Straße

  • Type: Closure on one side
  • Location: At house number 161
  • Duration: 29.02. - 13.03.2024
  • Reason: Work on the supply lines
  • Details: The construction site can be passed safely on foot.

Saalstraße / western sidewalk in Löbdergraben

  • Type: Traffic disruption
  • Duration: 04.03. - 15.03.2024
  • Reason: Laying of media
  • Details: Pedestrians can safely pass the construction site in Saalstraße

Finished closures

Cospedaer Grund

  • Traffic safety work has been completed.

Existing closures

Brückenstraße / Leibnizstraße

  • Type: Half-sided closure
  • Duration: until 12.04.2024
  • Reason: Laying of district heating pipe
  • Details: The one-way street is passable in the direction of Kunitz. Out-of-town traffic will be diverted via the street "Am Steinbach".

Bürgelsche Straße

  • Type: Temporary one-way closure
  • Location: At house no. 15
  • Duration: until 08.03.2024
  • Reason: Civil engineering works in the sidewalk area
  • Details: Traffic will be guided alternately by means of mobile traffic lights.

Dammstraße

  • Type: Complete closure
  • Duration: until 30.05.2024
  • Reason: Laying of pipes and renewal of the road surface
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.

1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße

Ernst-Pfeiffer-Straße

  • Type: Complete closure
  • Duration: until 01.04.2024
  • Reason: Surface course + boarding installation
  • Details: The construction site can be passed safely on foot

Frommannstraße

  • Type: Complete closure
  • Duration: until 15.03.2024
  • Reason: Road surface renovation

Grenzstraße

  • Type: Half-sided closure
  • Location: At house number 2-4
  • Duration: until 29.03.2024
  • Reason: Construction of an apartment building
  • Details: Pedestrians will be guided safely past the construction site with the help of an emergency pedestrian path.

Hermann-Löns-Straße

  • Type: Half-time closure
  • Location: at the level of the crosswalk to the junction with Mühlenstraße
  • Duration: until 31.07.2024
  • Reason: Lighting and remaining work on the crosswalk
  • Details: Traffic will be guided past the construction site by means of a mobile traffic light system

Im Steinfeld

  • Type: Complete closure
  • Location: At house number 12
  • Duration: until 08.03.2024
  • Reason: Construction of a sewage, electrical and drinking water house connection
  • Details: The detour is via the road "Am Naßtal"

Johannisstraße

  • Type: Traffic restrictions
  • Location: Eastern Johannisstraße 17-22
  • Duration: until 26.04.2024
  • Reason: Remaining work on laying district heating (Stadtwerke Jena)
  • Details: The construction site is safe for pedestrians. Cyclists must push due to insufficient remaining width. Provided the weather cooperates, the construction work can be completed ahead of schedule at the end of March. This means that there should be as little disruption as possible for outdoor catering and visitors to the spring market.

Lobeda East and Lobeda Old Town

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 24.05.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot

Löbichauer Straße

  • Type: Complete road closure
  • Location: Lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
  • Duration: until 30.11.2024
  • Reason: Civil engineering works
  • Details: Pedestrians will be safely rerouted.

Naumburger Straße

  • Type: Half-sided closure
  • Duration: until 30.04.2024
  • Reason: Conversion of the streetcar stop + installation of track replacement
  • Details: During the construction period, a one-way street will be installed from the Zitzmannstraße junction to Altenburger Straße. The one-way street is passable in the direction of the city center. The construction site can be passed safely on foot.

Nollendorfer Straße

  • Type: Complete closure
  • Location: between Thomas-Mann-Straße and Dornburger Straße
  • Duration: until 30.05.2024
  • Reason: Major road renovation

Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
  • Duration: until 30.04.2024
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.

Remderoda

  • Type: Complete closure
  • Location: Road in the direction of Remderoda
  • Duration: until 30.05.2024
  • Reason: Laying of drinking water pipe
  • Details: A detour via Münchenroda will be signposted.

Schroeterstraße

  • Type: Complete closure
  • Location: from the junction with Strigelstraße to the junction with Am Friedensberg
  • Duration: until 30.04.2024
  • Reason: Fundamental expansion of the road
  • Details: A second construction phase for the rest of the road is expected to follow from May 2024

Wöllnitz

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 31.05.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Ziegenhain

  • Type: Traffic restrictions
  • Duration: until 30.03.2024
  • Reason: Fiber optic expansion

Announcements

Oberaue

  • Type: Access restrictions
  • Duration: 18.03. - 17.05.2024
  • Reason: Remaining work
  • Details: The mobile traffic light system will be reactivated. Entry to the Oberaue is possible.