Dummy link to fix Firefox-Bug: First child with tabindex is ignored

Jena construction site report for the 12th calendar week (18 - 24.03.2024)

15.03.2024

Unless otherwise indicated, you can get past the roadworks on foot and by bike.

New closures / obstructions

Area: Stadium and city center

Type: Traffic restrictions
Duration: 16.03.2024, from approx. 12 noon
Reason: Football match
Details: Due to the soccer match of FC Carl Zeiss Jena against Rot-Weiß Erfurt, traffic restrictions are to be expected on Saturday, 16.3.2024 from approx. 12 noon. Obstructions may also occur in the city center due to possible fan marches.

Erlanger Allee

  • Type: Traffic restrictions
  • Location: from the pedestrian crossing at Paul-Schneider-Straße to the junction with Kastanienstraße
  • Duration: 23.03. - 19.04.2024
  • Reason: Road surface renovation
  • Details: There will be various construction phases during the construction period. Detour signs will be set up on site. The construction site can be passed safely on foot. Please refer to the diagrams for further information.

Umleitungsplan Erlanger Allee

Detour plan Erlanger Allee

Streicher traffic engineering

Erlanger Allee Bauphase 1

Erlanger Allee construction phase 1

Streicher traffic engineering

Erlanger Allee Bauphase 2

Erlanger Allee construction phase 2

Streicher traffic engineering

Erlanger Allee Bauphase 3

Erlanger Allee construction phase 3

Streicher traffic engineering

Oberaue

  • Type: Access restrictions
  • Duration: 18.03. - 17.05.2024
  • Reason: Remaining work
  • Details: The mobile traffic light system will be reactivated. The entrance to Oberaue is possible.

Winzerlaer Straße

  • Type: Closure on one side
  • Location: between the junction with Adolf-Reichwein-Straße and the junction with Rosalind-Franklin-Straße
  • Duration: 18.03. - 05.04.2024
  • Reason: Reconstruction work
  • Details: During the construction period, an emergency sidewalk and a construction site access/exit will be set up. Motorized individual traffic will be guided past the construction site by means of a mobile traffic light system.

Completed closures

Im Steinfeld

  • The sewage, electrical and drinking water house connections have been installed.

Existing closures

B7

  • Type: Half-sided closure
  • Location: between the "Vor der Gembdenmühle" junction and the Jena exit sign
  • Duration: until 01.04.2024
  • Reason: Road surface renovation incl. sidewalk construction
  • Details: Traffic will be guided past the construction site by means of mobile traffic lights.

Brückenstraße / Leibnizstraße

  • Type: Half-sided closure in the form of a one-way street regulation
  • Duration: until 12.04.2024
  • Reason: Laying of district heating pipeline
  • Details: The one-way street is passable in the direction of Kunitz. Out-of-town traffic will be diverted via the street "Am Steinbach".

Dammstraße

  • Type: Complete closure
  • Duration: until 30.05.2024
  • Reason: Laying of pipes and renewal of the road surface
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.

1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße

Erlanger Allee - cycle path connection

  • Type: Temporary closure
  • Location: between Lobeda-Ost and Lobeda-West
  • Duration: until 03.05.2024
  • Reason: Remaining work

Ernst-Pfeiffer-Straße

  • Type: Complete closure
  • Duration: until 01.04.2024
  • Reason: Surface course + boarding installation
  • Details: The construction site can be passed safely on foot

Fritz-Reuter-Straße

  • Type: Full road closure in sections
  • Duration: until 12.04.2024
  • Reason: Reconstruction of the combined sewer

Frommannstraße

  • Type: Complete closure
  • Duration: until 28.03.2024
  • Reason: Road surface renovation

Grenzstraße

  • Type: Half-sided closure
  • Location: At house number 2-4
  • Duration: until 29.03.2024
  • Reason: Construction of an apartment building
  • Details: Pedestrians will be guided safely past the construction site with the help of an emergency pedestrian path.

Hermann-Löns-Straße

  • Type: Half-time closure
  • Location: at the level of the crosswalk to the junction with Mühlenstraße
  • Duration: until 31.07.2024
  • Reason: Laying of medium voltage cable
  • Details: Traffic will be guided past the construction site by means of mobile traffic lights.

Johannisstraße

  • Type: Traffic restrictions
  • Location: Eastern Johannisstraße 17-22
  • Duration: until 26.04.2024
  • Reason: Remaining work laying district heating (Stadtwerke Jena)
  • Details: The construction site is safe for pedestrians. Cyclists must push due to insufficient remaining width. Provided the weather cooperates, the construction work can be completed ahead of schedule at the end of March. This means that there should be as little disruption as possible for outdoor catering and visitors to the spring market.

Lobeda East and Lobeda Old Town

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 07.06.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Löbichauer Straße

  • Type: Complete closure
  • Location: lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
  • Duration: until 30.11.2024
  • Reason: Civil engineering works
  • Details: Pedestrians will be safely rerouted.

2x Naumburger Straße

  • Type: Half-sided closure
  • Duration: until 30.04.2024
  • Reason: Reconstruction of the streetcar stop "Stifterstr." + installation of track replacement
  • Details: During the construction period, a one-way street will be installed from the Zitzmannstraße junction to Altenburger Straße. The one-way street is passable in the direction of the city center. The construction site can be passed safely on foot.
  • Type: Half-sided closure
  • Location: At house number 161
  • Duration: until 22.03.2024
  • Reason: Work on the supply lines
  • Details: The construction site can be passed safely on foot.

Nollendorfer road

  • Type: Complete closure
  • Location: between Thomas-Mann-Straße and Dornburger Straße
  • Duration: until 30.05.2024
  • Reason: Major road renovation

Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
  • Duration: until 30.04.2024
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.

Remderoda

  • Type: Complete closure
  • Location: Road in the direction of Remderoda
  • Duration: until 30.05.2024
  • Reason: Laying of drinking water pipe
  • Details: A detour via Münchenroda will be signposted.

Saalstraße / western sidewalk in Löbdergraben near Saaltor

  • Type: Traffic disruption
  • Duration: until 22.03.2024
  • Reason: Laying of media
  • Details: Pedestrians can safely passthe construction site in Saalstraße.

Schroeterstraße

  • Type: Complete closure
  • Location: from the junction with Strigelstraße to the junction with Am Friedensberg
  • Duration: until 30.04.2024
  • Reason: Fundamental expansion of the road
  • Details: A second construction phase for the rest of the road is expected to follow from May 2024

Wöllnitz

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 31.05.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Ziegenhain

  • Type: Traffic restrictions
  • Duration: until 30.03.2024
  • Reason: Fiber optic expansion

Announcements:

Hermann-Löns-Straße

  • Type: Temporary half-sided closure
  • Location: Height Mühlenstraße
  • Duration: 08 - 12.04.2024
  • Reason: Search shafts for the purpose of a cable route
  • Details: Traffic will be diverted past the construction site by means of signs. Furthermore, a one-way street will be set up in Mühlenstraße between the junction with Hermann-Löns-Straße and the junction with Am Knollen, which can be driven on in the direction of Kahlaische Straße.
Kategorie
Cookies management panel
This site uses cookies and gives you control over what you want to activate