Jena construction site report for the 13th calendar week (25 - 31.03.2024)
Unless otherwise indicated, you can get past the roadworks on foot and by bike.
New closures / obstructions
Lichtenhainer Oberweg
- Type: Various restrictions
- Location: Tatzendpromenade junction to access to the P10 Zeiss parking lot
- Duration: 25.03. - 31.12.2024
- Reason: Laying of district heating pipeline
- Details: From 25.03. to 30.06.2024, the work will initially be carried out with the road closed on one side. For this purpose, Lichtenhainer Oberweg will become a one-way street in the direction of Lichtenhain. A detour via Mühlenstraße will be signposted for traffic heading into the city. From July onwards, the Lichtenhainer Oberweg will have to be fully closed in sections. The construction site will gradually work its way from the upper part of Lichtenhainer Oberweg towards Tatzendpromenade. Detour will be signpostedvia Friedrich-Körnerstrasse, Döbereinerstrasse and Philipp-Müller-Strasse. Stadtwerke Energie Jena-Pößneck asks for your understanding for the restrictions.
Closures completed
Saalstraße / western sidewalk in Löbdergraben near Saaltor
- Media laying is finished.
Existing closures
B7
- Type: Half-sided closure
- Location: between the "Vor der Gembdenmühle" junction and the Jena exit sign
- Duration: until 01.04.2024
- Reason: Road surface renovation incl. sidewalk construction
- Details: Traffic will be guided past the construction site by means of a mobile traffic light system
Brückenstraße / Leibnizstraße
- Type: Half-sided closure in the form of a one-way street regulation
- Duration: until 12.04.2024
- Reason: Laying of district heating pipeline
- Details: The one-way street is passable in the direction of Kunitz. Out-of-town traffic will be diverted via the street "Am Steinbach".
Dammstraße
- Type: Complete closure
- Duration: until 30.05.2024
- Reason: Laying of pipes and renewal of the road surface
- Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.
1st construction phase: Magnus-Poser-Straße to Schenkstraße
2nd construction phase: Schenkstraße to Charlottenstraße
Erlanger Allee - cycle path connection
- Type: Temporary closure
- Location: between Lobeda-Ost and Lobeda-West
- Duration: until 03.05.2024
- Reason: Remaining work
Erlanger Allee
- Type: Traffic restrictions
- Location: from the pedestrian crossing at Paul-Schneider-Straße
- Duration: until 19.04.2024
- Reason: Road surface renovation
- Details: There will be various construction phases during the construction period. Detour signs will be set up on site. The construction site can be passed safely on foot. Please refer to the diagrams for further information.
Detour plan Erlanger Allee
Streicher traffic engineering
Erlanger Allee construction phase 1
Streicher traffic engineering
Erlanger Allee construction phase 2
Streicher traffic engineering
Erlanger Allee construction phase 3
Streicher traffic engineering
Ernst-Pfeiffer-Straße
- Type: Complete closure
- Duration: until 01.04.2024
- Reason: Surface course + boarding installation
- Details: The construction site can be passed safely on foot
Fritz-Reuter-Straße
- Type: Full road closure in sections
- Duration: until 12.04.2024
- Reason: Reconstruction of the combined sewer
Frommannstraße
- Type: Complete closure
- Duration: until 28.03.2024
- Reason: Road surface renovation
Grenzstraße
- Type: Half-sided closure
- Location: At house number 2-4
- Duration: until 29.03.2024
- Reason: Construction of an apartment building
- Details: Pedestrians will be guided safely past the construction site with the help of an emergency pedestrian path.
Hermann-Löns-Straße
- Type: Half-time closure
- Location: at the level of the crosswalk to the junction with Mühlenstraße
- Duration: until 31.07.2024
- Reason: Laying of medium voltage cable
- Details: Traffic will be guided past the construction site by means of a mobile traffic light system
Johannisstraße
- Type: Traffic restrictions
- Location: Eastern Johannisstraße 17-22
- Duration: until 26.04.2024
- Reason: Remaining work laying district heating (Stadtwerke Jena)
- Details: The construction site is safe for pedestrians. Cyclists must push due to insufficient remaining width. Provided the weather cooperates, the construction work can be completed ahead of schedule at the end of March. This means that there should be as little disruption as possible for outdoor catering and visitors to the spring market.
Lobeda East and Lobeda Old Town
- Type: Temporary half-side closure + sidewalk closure
- Duration: until 07.06.2024
- Reason: Civil engineering work for laying fiber optic cables
- Details: The construction site can be passed safely on foot.
Löbichauer Straße
- Type: Complete closure
- Location: lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
- Duration: until 30.11.2024
- Reason: Civil engineering works
- Details: Pedestrians will be safely rerouted.
2x Naumburger Straße
- Type: Half-sided closure
- Duration: until 30.04.2024
- Reason: Reconstruction of the streetcar stop "Stifterstr." + installation of track replacement
- Details: During the construction period, a one-way street will be installed from the Zitzmannstraße junction to Altenburger Straße. The one-way street is passable in the direction of the city center. The construction site can be passed safely on foot.
- Addition: In the period 25.03. - 05.04.2024, additional civil engineering work must be carried out at the local traffic construction site. This will involve removing large quantities of earth from the construction site. In order to be able to carry out this work using excavators, the road must be fully closed in order to maintain the safety distances. The work should be completed by the end of the Easter vacations. Afterwards, the road will be closed again on one side.
- Type: Half road closure
- Location At house number 161
- Duration: until 05.04.2024
- Reason: Work on the supply lines
- Details: The construction site can be passed safely on foot.
Nollendorfer road
- Type: Complete closure
- Location: between Thomas-Mann-Straße and Dornburger Straße
- Duration: until 30.05.2024
- Reason: Major road renovation
2x Oberaue
- Type: Complete closure
- Location: From the Saaleeingang Ernst-Abbe-Sportfeld to just before the Lichtenhainer Brücke bridge
- Duration: until 30.04.2024
- Reason: Work on the stadium grandstand
- Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.
- Type: Access restrictions
- Duration: until 17.05.2024
- Reason: Remaining work
- Details: The mobile traffic light system will be reactivated. Entry to the Oberaue is possible.
Remderoda
- Type: Complete closure
- Location: Road in the direction of Remderoda
- Duration: until 30.05.2024
- Reason: Laying of drinking water pipe
- Details: A detour via Münchenroda will be signposted.
Schroeterstraße
- Type: Complete closure
- Location: from the junction with Strigelstraße to the junction with Am Friedensberg
- Duration: until 30.04.2024
- Reason: Fundamental expansion of the road
- Details: A second construction phase for the rest of the road is expected to follow from May 2024
Winzerlaer Straße
- Type: Half-sided closure
- Location: between the junction with Adolf-Reichwein-Straße and the junction with Rosalind-Franklin-Straße
- Duration: until 05.04.2024
- Reason: Reconstruction work
- Details: During the construction period, an emergency sidewalk and a construction site access/exit will be set up. Motorized individual traffic will be guided past the construction site by means of a mobile traffic light system.
Wöllnitz
- Type: Temporary road closure on one side + footpath closure
- Duration: until 31.05.2024
- Reason: Civil engineering work for laying fiber optic cables
- Details: The construction site can be passed safely on foot.
Ziegenhain
- Type: Traffic restrictions
- Duration: until 30.03.2024
- Reason: Fiber optic expansion
Announcements:
Teichgraben
- Type: Half-sided closure
- Location: Height Mühlenstraße
- Duration: 08.04. - 24.05.2024
- Reason: Renovation of the bus stop (barrier-free) incl. surface course work
- Details: Traffic will be maintained by means of one-way traffic regulations. The construction site can be safely passed on foot in the longitudinal direction. House entrances and stores are within walking distance. Substitute stops will be set up by local transport, further information can be found at www.stadtwerke-jena.de/nahverkehr
Hermann-Löns-Straße
- Type: Temporary half road closure
- Location: At Mühlenstraße level
- Duration: 08 - 12.04.2024
- Reason: Search shafts for the purpose of a cable route
- Details: Traffic will be diverted past the construction site by means of signage. In addition, a one-way street will be set up in Mühlenstraße between the junction with Hermann-Löns-Straße and the junction with Am Knollen, which can be driven on in the direction of Kahlaische Straße.
Kahlaische Straße
- Type: Temporary one-way closure
- Location: At house number 50 + 54
- Duration: 02 - 05.04.2024
- Reason: Search shafts for the purpose of a cable route
- Details: Traffic will be guided past the construction site by means of mobile traffic lights.