Jena construction site report for the 24th calendar week (10 - 16.06.2024)

07.06.2024

Unless otherwise indicated, you can get past the roadworks on foot and by bike.

New closures / obstructions

Dornburger Straße

  • Type: Complete closure
  • Location: At the junction with Nollendorfer Straße
  • Start: 10.06. - 28.06.2024
  • Reason: Civil engineering works
  • Details: The closure can be bypassed via Scharnhorststraße. Detour signs will be installed for this purpose. The construction site can be safely passed on foot.

Löbdergraben

  • Type: Narrowing of lane
  • Start: 10.06. - 09.08.2024
  • Reason: Securing the construction work on the outdoor facilities of the Inselplatz campus
  • Details: The eastbound lanes on Lutherplatz (Am Anger) will be narrowed to one lane over a distance of approx. 50.00 m from Löbdergraben. In Fürstengraben, the traffic flows will be separated into right-turning and straight-ahead vehicles.

Stadtrodaer Straße

  • Type: Half-sided closure
  • Location: behind the Lobedaer Straße bridge in the direction of Wöllnitz (towards the city center)
  • Start: 10.06. - 21.06.2024, daily from 9:00 am - 2:30 pm
  • Reason: Work is taking place in the side area as part of the fiber optic expansion.

Finished closures

Spitzweidenweg

  • New construction of the charging infrastructure is complete.

Existing closures

Am Steinbach

  • Type: One-way traffic
  • Location: Am Steinbach will become a one-way street in the direction of Wiesenstraße.
  • Duration: until 14.06.2024
  • Reason: Preparation for major construction project "Wiesenstraße traffic circle"
  • Details: During this period, the trafficisland for traffic turning into Naumburger Straße is to be constructed in preparation for the major construction project "Wiesenstraße traffic circle" so that large vehicles can also drive onto the B 88 without obstruction.

Brückenstraße

  • Type: Sectional half-side closures
  • Location: between the construction site for the future traffic circle (Wiesenstraße / Brückenstraße) and the Kunitz house bridge
  • Duration: 28.06.2024
  • Reason: Civil engineering work on the supply lines
  • Details: The road width will be narrowed at the respective construction site, traffic can pass on both sides. As the work will primarily be carried out in the sidewalk area, restrictions for pedestrians are to be expected.

Dammstrasse

  • Type: Complete closure
  • Duration: until 31.12.2024
  • Reason: Laying of pipes and renewal of the road surface
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.

2nd construction phase: Schenkstraße to Charlottenstraße

Ernst-Haeckel-Straße

  • Type: Complete closure
  • Location: between Erbertstraße and Sellierstraße
  • Duration: until 30.06.2024
  • Reason: Work on the drinking water pipeline
  • Details: Traffic will be diverted via the following route: Vor dem Neutor - Knebelstraße - Am Eisenbahndamm - Fürstengraben. Erbertstraße will be open to private traffic for the time being until construction progress requires it. Access to Sellierstraße from the direction of Ernst-Haeckel-Straße is closed. The construction site can be safely crossed on foot.

Georg-Büchner-Straße

  • Type: Sectional full closure incl. sidewalk area
  • Location: At house number 1-16
  • Duration: 16.06.2024
  • Reason: Civil engineering works
  • Details: Pedestrians will be guided safely past the construction site on the roadway. Access to the parking lots is guaranteed.

Border road

  • Type: Closure on one side
  • Location: At house numbers 2 - 4
  • Duration: until 30.06.2024
  • Reason: Construction of an apartment building
  • Details: Pedestrians will be guided safely past the construction site using an emergency pedestrian route.

Hermann-Löns-Straße

  • Type: Closure on one side
  • Location: up to the junction with Mühlenstraße
  • Duration: until 14.06.2024
  • Reason: Laying of a medium-voltage cable
  • Details: Traffic will be guided past the construction site by means of a mobile traffic light system.

Karl-Liebknecht-Straße

  • Type: Complete closure
  • Location: between Feldstraße and Brändströmstraße
  • Duration: until 02.08.2024
  • Reason: Laying of combined sewer on behalf of Stadtwerke Jena
  • Details: Traffic will be widely diverted via Wiesenstraße - Am Anger - Camsdorfer Brücke. Bicycle traffic will be diverted via: Pestalozzistraße - Gabelsbergerstraße - Am Steinborn. Streetcar services will continue to run despite the construction work.

Keßlerstraße

  • Type: Complete closure
  • Location: between Göschwitzer Straße and Geraer Straße (1st construction phase)
  • Duration: until 28.06.2024
  • Reason: fundamental expansion in the Grenzstraße area
  • Details: A detour will be signposted. Pedestrians can pass the construction site safely.

Church square

  • Type: Traffic restrictions
  • Location: Around the town church
  • Duration: 30.12.2024
  • Reason: Extensive construction work
  • Details: The construction site is safe for pedestrians and access to the town church is guaranteed throughout the construction period. However, Saalstraße will be fully closed to transit/delivery traffic.

Lichtenhainer Oberweg

  • Type: Various restrictions
  • Location: Tatzendpromenade junction to access to the P10 Zeiss parking lot
  • Duration: until 31.12.2024
  • Reason: Laying of district heating pipeline
  • Details: From 25.03. to 30.06.2024, the work will initially be carried out with the road closed on one side. For this purpose, Lichtenhainer Oberweg will become a one-way street in the direction of Lichtenhain. A detour via Mühlenstraße will be signposted for traffic heading into the city. From July, the Lichtenhainer Oberweg will have to be closed to traffic in sections. The construction site is gradually working its way from the upper part of Lichtenhainer Oberweg towards Tatzendpromenade. Detour will be signposted via Friedrich-Körnerstrasse, Döbereinerstrasse and Philipp-Müller-Strasse. Stadtwerke Energie Jena-Pößneck asks for your understanding for the restrictions.

Lobeda Ost and Lobeda Altstadt

  • Type: Temporary half-side closure + sidewalk closure
  • Duration: until 14.06.2024
  • Reason: Civil engineering work for laying fiber optic cables
  • Details: The construction site can be passed safely on foot.

Eastern Löbdergraben

  • Type: Complete closure
  • Location: between Steinweg and Lutherplatz
  • Duration: until 09.08.2024
  • Reason: Roadworks and media relocation
  • Details: Traffic will be diverted via the following route Am Eisenbahndamm - Am Anger - Lutherplatz.
    People on foot use the western side of Löbdergraben.
  • Addition: A new traffic route has been set up for road users wishing to drive from the eastern Löbdergraben towards the Fürstengraben junction. It is possible to follow the signs and drive through the bus stop area in the direction of the Fürstengraben junction. There you have the possibility to turnleft. When entering the track area from Löbdergraben, the streetcar must be given priority. We ask road users to drive carefully and considerately in this area.

Löbichauer Straße

  • Type: Complete closure
  • Location: Lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
  • Duration: until 30.11.2024
  • Reason: Civil engineering works
  • Details: Pedestrians will be safely rerouted.

Moritz-von-Rohr-Straße

  • Type: Complete closure
  • Location: at the level of the university of applied sciences
  • Duration: until 21.06.2024
  • Reason: Civil engineering works (medium voltage cable)
  • Details: The closure can be bypassed via Carl-Zeiss-Promenade. The construction site can be safely passed on foot.

Naumburger Straße

  • Type: Full closure Closure
  • Duration: until 31.07.2024
  • Reason: Reconstruction of the "Stifterstraße" streetcar stop + installation of track replacement
  • Addition: In the period 25.03. - 31.07.2024, additional civil engineering work must be carried out at the local transport construction site. Due to the additional track drainage with associated shafts, the road must remain fully closed in order to work with appropriate equipment from the roadway in the construction area. Individual traffic cannot flow due to the safety regulations to be observed.
  • As a result, the buses of the rail replacement service (SEV line E) will continue to take an alternative route.

    The Stifterstraße stop is still unavailable and the Altenburger Straße replacement stop cannot be reached. Passengers are requested to use the Merseburger Straße stop instead.

Nollendorfer Straße

  • Type: Complete closure
  • Location: between Thomas-Mann-Straße and Dornburger Straße
  • Duration: until 30.09.2024
  • Reason: Major road renovation

Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld to just before the Lichtenhainer Brücke bridge
  • Duration: until 30.06.2024
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.

Remderoda

  • Type: Complete closure
  • Location: Road in the direction of Remderoda
  • Duration: until 15.09.2024
  • Reason: Laying of drinking water pipe
  • Details: A detour via Münchenroda will be signposted.

Schroeterstraße

  • Type: Complete closure
  • Location: from the junction with Strigelstraße to the junction with Am Friedensberg
  • Duration: until 30.10.2024
  • Reason: Fundamental expansion of the road

Ziegenhain

  • Type: Traffic restrictions
  • Duration: until 28.06.2024
  • Reason: Fiber optic expansion

Announcements

Kahlaische Straße

  • Type: Complete closure
  • Location: between house numbers 46-68
  • Duration: 20.06. - 31.07.2024 (summer vacation)
  • Reason: Laying of media in the sidewalk area by Stadtwerke Jena
  • Details: The road must serve as an emergency footpath and as a construction site facility for the work to be carried out. The outbound lane is part of the construction site. On the side leading into the city, an alternative footpath will be set up for pedestrians, which will also be open to bicycle traffic. Residents- especially businesses - will be guaranteed access to their properties. The large-scale detour will be via Stadtrodaer Straße.

Ernst-Abbe-Platz

  • Duration: 20.06. - 30.08.2024
  • Reason: Extensive construction work in the track area
  • Details: Crossing facilities will be set up for pedestrians.