Jena construction site report for the 39th calendar week (23 - 29.09.2024)

19.09.2024

We wish all road users a safe and pleasant journey. Unless otherwise stated, you can get past the roadworks on foot and by bike.

New road closures / obstructions

Dornburger Straße

  • Type: Half-sided closure + sidewalk closure
  • Location: between Nordschule and An der Eule
  • Duration: 23.9. - 08.11.2024
  • Reason: Reconstruction of the streetcar catenary system
  • Details: Dornburger Straße must be fully closed at certain points for the installation of the masts.

What is being done?

  • From September 23: In preparation for construction, the company TS Bau is installing so-called search slots to identify the location of cables or other obstacles. This helps to avoid damage during the subsequent foundation work. The work is carried out in the sidewalk area. Depending on the specific conditions in the construction area, short-term obstructions for pedestrians and/or car traffic are to be expected.
  • The pipe foundations for the new overhead line mastswill be laid from the beginning of October. A pile driver will also be used, which may lead to increased noise. This construction phase will take around two weeks.
  • The catenary masts will be installed from October 28. This work will be carried out at night at around ten locations. This will also require selective closures of Dornburger Strasse and Naumburger Strasse, as the masts will have to be lifted over the overhead line from the road. This work can only be carried out during times when there is little traffic, as the overhead line has to be disconnected each time for safety reasons.
  • The cross spans and cantilevers will be pre-assembled from mid-November until the end of March 2025.
  • Finally, the contact wire is scheduled to be replaced duringthe 2025 Easter vacations .

Completed closures

Eisenberger Straße

  • The construction of a fiber optic route using the flush drilling method has been completed.

Existing closures

Bertolt-Brecht-Straße

  • Type: Complete closure
  • Location: in the area of house number 2 - 16
  • Duration: until 28.09.2024
  • Reason: Roadway renovation
  • Details: The detour for individual and bus traffic is via Berthold-Brecht-Straße in the section from house number 18-32.

Carl-Zeiß-Platz

  • Type: Complete closure
  • Duration: until 29.08.2025
  • Reason: Renovation + new construction of the German Optical Museum
  • Details: The carriageway in front of the buildings Carl-Zeiß-Platz 12-14 is required for construction site equipment.

Carl-Zeiß-Promenade

  • Type: Half-sided closure
  • Location: At the level of Lichtenhainer Straße
  • Duration: until 20.12.2024
  • Reason: Connection of the district heating pipeline and various media
  • Details: Traffic will be guided alternately by means of traffic lights. In addition, Lichtenhainer Oberweg and Lichtenhainer Straße will be closed to through traffic.

Dammstrasse

  • Type: Complete closure
  • Duration: until 31.12.2024
  • Reason: Laying of pipes and renewal of the road surface
  • Details: The construction work is divided into two construction phases. Pedestrians can pass the construction site safely. A detour for private traffic will be signposted on site.
  • 2nd construction phase: Schenkstraße to Charlottenstraße

Dornburger Straße

  • Type: Various road closures
  • Location House number 6
  • Start: 19.06.2024
  • Reason: Construction of a new house
  • Details: From this date, the sidewalk along the property and the adjacent parking lane will be required and closed for the construction site equipment. It is expected that the roadway out of town will also be required in September until the shell of the building is completed. Out-of-town traffic will be diverted via Spitzweidenweg and Nollendorfer Straße.

Drackendorfer Weg

  • Type: Spot closure
  • Duration: until 11.10.2024
  • Reason: Dismantling of medium-voltage cables
  • Details: this measure also affects Richard-Zimmermann-Straße and Paul-Schneider-Straße in the further course.

Ernst-Abbe-Platz

  • Duration: until 30.11.2024
  • Reason: Extensive construction work in the track area
  • Details: Crossing facilities for pedestrians will be set up.

Forstweg

  • Type: Complete closure
  • Location: below the railroad bridge
  • Duration: until 25.10.2024
  • Reason: Work on the pressure reduction shaft for the drinking water supply
  • Details: Traffic is permitted up to the construction site. The construction site can be passed safely on foot.

Friedrich-Engels-Straße

  • Type: Complete road closure
  • Location: Junction with Wöllnitzer Straße to junction with Kernbergstraße
  • Duration: until 27.06.2025 (overall measure)
  • Reason: Media relocation
  • 1st construction phase: 01.08 - 23.12.2024
    Between the junction of Wöllnitzer Straße and the junction of Am Kochersgraben
  • Details: The detour is via Jenertal - Kernbergstraße. A detour will be signposted. The construction site can be passed on foot. The directly affected residents will receive updated information on the accessibility of their properties and contact details of the relevant contact persons before the start of construction.
  • 2nd construction phase: start 2025
    Between the Kochersgraben junction and the Kernbergstraße junction
  • 🚍 Information on the Mühltal bus route 16
    Bus route 16 Mühltal - city center - Ziegenhainer Tal is also affected by the closure. Jena public transport will be setting up a shuttle service here from August 1.

Geraer Straße

  • Type: Complete closure
  • Location: Geraer Straße junction up to before the railroad bridge
  • Duration: until 30.11.2024
  • Reason: Major roadworks
  • Details: A detour will be signposted on site.

Grietgasse/ Holzmarkt

  • Type: Complete closure
  • Location: at the level of Bürgerservice/ Ernst-Abbe library
  • Duration: until 30.09.2024
  • Reason: Renewal of the district heating pipeline incl. integration of the supply lines into the existing network
  • Details: Access to Neugasse is still only possible from the direction of Volksbad. Pedestrians and cyclists can pass the construction site. A detour for motor traffic will be signposted. Holzmarkt will remain closed from the Teichgraben junction. Bus and through traffic will continue to use a detour route.

Hornstraße

  • Type: Complete closure
  • Location: between the Magdelstieg junction and Hornstraße 4
  • Duration: probably until 30.09.2024
  • Reason: Accident
  • Details: Repair work on the sewage pipe has been completed. The remaining road construction work will take place from 19.08.2024.

Isserstedter road

  • Type: Complete closure
  • Location: from house number 21 to the junction with Zum Ziskauer Tal
  • Start: 02.09.2024
  • Reason: Fundamental road expansion
  • Details: The detour will be signposted on site. The work in the entire district of Lützeroda will continue until the end of 2025

Kernberg district

  • Type: Traffic restrictions
  • Duration: until 30.12.2024
  • Reason: Fiber optic expansion

Church square

  • Type: Traffic restrictions
  • Location: City church surroundings
  • Duration: until 30.12.2024
  • Reason: extensive construction work
  • Details: The construction site can be passed on foot, access to the town church is guaranteed during the entire construction period. Saalstraße will be fully closed to transit/delivery traffic.

Lichtenhainer Oberweg

  • Type: Various restrictions
  • Location: Tatzendpromenade junction to access to the P10 Zeiss parking lot
  • Duration: until 31.12.2024
  • Reason: Laying of district heating pipeline
  • Details: From July, the Lichtenhainer Oberweg will have to be fully closed in sections. The construction site is gradually working its way from the upper part of Lichtenhainer Oberweg towards Tatzendpromenade. Detour will be signposted via Friedrich-Körnerstrasse, Döbereinerstrasse and Philipp-Müller-Strasse. Stadtwerke Energie Jena-Pößneck asks for your understanding for the restrictions.

Eastern Löbdergraben

  • Type: Complete closure
  • Location: between Steinweg and Lutherplatz
  • Duration: until 01.11.2024
  • Reason: Road construction work and media relocation
  • Details: Traffic will be diverted via the following route Am Eisenbahndamm - Am Anger - Lutherplatz. The construction site can be crossed on foot via the footpath on the western side of Löbdergraben.
  • Addition: A new traffic route has been set up for road users who want to drive from the eastern Löbdergraben towards the Fürstengraben junction. It is possible to follow the signs and drive through the bus stop area in the direction of the Fürstengraben junction. When entering the track area from Löbdergraben, the streetcar must be given priority. Please drive carefully and considerately in this area.

Löbdergraben

  • Type: Narrowing of lane
  • Start: until 01.11.2024
  • Reason: To ensure the construction work on the outdoor facilities of the Inselplatz campus
  • Details: The eastbound lanes on Lutherplatz (Am Anger) will be narrowed to one lane over a distance of approx. 50.00 m from Löbdergraben. In Fürstengraben, the traffic flows will be separated into right-turning and straight-ahead vehicles.

Löbichauer Straße

  • Type: Complete closure
  • Location: Lower Löbichauer Straße (Karl-Liebknecht-Straße to Eschenplatz)
  • Duration: until 30.11.2024
  • Reason: Civil engineering works
  • Details: Pedestrians will be safely rerouted.
  • Addition: From 12.08. - 13.12.2024 Löbichauer Straße will be fully closed until Eugen-Diederich-Straße. The extension of the construction site is necessary due to the reconstruction of sewage, drinking water and gas pipes and the construction of a new road. The detour will be via Im Ritzetal.

Martin-Niemöller-Straße

  • Type: Half-sided closure
  • Start: until 30.10.2024
  • Reason: Relocation of medium voltage road
  • Details: The construction site can be passed safely on foot.

2x Mühlenstraße

  • Type: Complete closure
  • Location: House number 48 - 100
  • Duration: until 20.12.2024
  • Reason: Work on the electrical line
  • Details: The detour is via Lichtenhainer Oberweg. The area above can also be accessed via Lützowstraße - Wildenbruchstraße.
  • Type: Half-sided closure by setting up a one-way street
  • Location: At house number 21
  • Duration: until 31.10.2024
  • Reason: Civil engineering works
  • Details: The one-way street will only be set up in the immediate construction area and can be driven on from Kahlaische Straße in the direction of Hermann-Löns-Straße. The construction site can be passed safely on foot.

Münchenrodaer Grund

  • Type: Half-sided closure
  • Location: Corner of Münchenrodaer Straße
  • Duration: until 27.09.2024
  • Reason: Rock stabilization
  • Details: Traffic will be guided past the closure on both sides by means of mobile traffic lights.

Naumburger Straße

  • Type: Full closure Closure
  • Location: between Zitzmannstraße and Altenburger Straße
  • Duration: until 30.09.2024
  • Reason: Conversion of the "Stifterstraße" streetcar stop and fundamental expansion of the track system

Nollendorfer Straße

  • Type: Complete closure
  • Location: between Thomas-Mann-Straße and Dornburger Straße
  • Duration: until 30.12.2024
  • Reason: fundamental road renovation

Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld to just before the Lichtenhainer Brücke bridge
  • Duration: until 30.09.2024
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for cyclists and pedestrians is signposted.

Remderoda

  • Type: Complete closure
  • Location: Road in the direction of Remderoda
  • Duration: until 30.11.2024
  • Reason: Laying of drinking water pipe
  • Details: A detour via Münchenroda will be signposted.

2x Schroeterstraße

  • Type: Complete closure
  • Location: from Strigelstraße
  • Duration: until 30.12.2024
  • Reason: Fundamental road expansion to Forstweg
  • Details: The connection to Katharinenstraße is not possible during the construction period
  • Type: Complete closure
  • Location: from the junction with Strigelstraße to the junction with Am Friedensberg
  • Duration: until 30.10.2024
  • Reason: Fundamental road expansion

Traffic circle Wiesenstraße

  • Duration: 04.09.2024 - 29.11.2025
  • Reason: Work on the Wiesenstraße traffic circle construction project.
  • Details: The entire traffic junction will be completely redesigned so that all types of traffic can be accommodated and traffic can flow safely.

There are 3 construction phases in total:

  • 1st construction phase - construction of the north-west bypass and laying of the gas pipeline and empty conduits in the area of the bypass
  • 2nd construction phase - construction of the north-east bypass

During construction phases 1 and 2, each direction can be served.

  • 3rd construction phase - expansion of the junction

Access from the direction of Wiesenstraße to Brückenstraße and the industrial estate will no longer be possible from construction phase 3 onwards.
A wide detour will be signposted via Am Anger - Dornburger Straße - Camburger Straße.

Winzerlaer Straße

  • Type: Half-sided closure
  • Duration: until 04.10.2024
  • Reason: Repair work on the concrete slabs
  • Details: Individual traffic will be guided past the construction site on both sides by means of traffic lights.

Ziegenhain

  • Type: Traffic restrictions
  • Duration: until 27.09.2024
  • Reason: Fiber optic expansion

Announcements

Mühlenstraße

  • Type: Complete closure
  • Location: At viaduct level
  • Duration: 07.10. - 09.10.2024
  • Reason: Dismantling of the district heating pipeline
  • Details: For pedestrians and cyclists, the passageway will also be closed for safety reasons.

Rudolstädter Straße

  • Type: Complete closure
  • Location: Track triangle Winzerla
  • Duration: 30.09. - 11.11.2024
  • Reason: Renewal of two points
  • Details: Private traffic will be widely diverted via Lobedaer Straße and Göschwitzer Straße.

🚍 Restrictions on local/regional traffic from September 30, 03:00 to November 11, 2024, 03:00 :

Streetcar line 3 only runs between Lobeda-Ost and Burgaupark. The Freizeitbad and Winzerla stops will not be
served. Passengers between Winzerla and Burgaupark should use bus line 10 from/to Enver-Simsek-Platz.

Bus routes 48, 480, 481, 482, 484 and 492 cannot serve the Burgaupark West and Freizeitbad stops.
Passengers who want to get on and off at the stops Winzerla, Winzergasse and Jena21 in the direction of Kahla,
please use bus lines 12 and 18 between Winzerla and Göschwitz. At the bus stop Göschwitz you can change to the
bus route 48 and the JES regional bus routes.

At Burgaupark, there will be an alternative stop in the direction of Kahla in Keßlerstraße Süd; at Reifsteinweg and the petrol station.
On bus route 490, there will be delays and changes to the timetable for the affected journeys.