Dummy link to fix Firefox-Bug: First child with tabindex is ignored

Jena construction site report for the 4th calendar week (20 - 26.01.2025)

17.01.2025

Unless otherwise indicated, you can get past the roadworks on foot and by bike.

New closures / obstructions

Forest road bridge

  • Type: Temporary full closure
  • Duration: 20.01.2025, in the period from 07:00 - 17:00
  • Reason: Tree felling work for the replacement construction in the bridge area
  • Details: From 17:00 to 07:00, the area is open to traffic on one side only. Traffic will be regulated by traffic lights. The bridge can be crossed on foot at any time.

Kahlaische Strasse

  • Type: Half-sided closure
  • Location: At house number 41
  • Duration: 21.01.2025, 08:30 am to 22.01.2025, 5:00 pm
  • Reason: Accident (rail breakage)
  • Details: Traffic will be regulated by traffic lights. The construction site should be avoided as traffic jams are to be expected. The area can be passed safely on foot.

Stadtrodaer Straße

  • Type: Temporary closure of one lane
  • Location: At Goldbergrampe
  • Duration: 21 - 23.01.2025
  • Reason: Soil investigation
  • Details: The alternating lane closure (inbound and outbound) will take place during the low-traffic period (09:00 -14:30) and will last approx. 4 hours in each direction.

Completed closures

None


Existing closures

Carl-Zeiß-Platz

  • Type: Complete closure
  • Location: House numbers 12 - 14
  • Duration: until 29.08.2025
  • Reason: Renovation and new construction of the German Optical Museum

Dammstraße

  • Type: Complete closure
  • Duration: until 30.06.2025
  • Reason: Laying of pipes and renewal of the road surface
  • Details: A detour will be signposted. The construction work is divided into two construction phases:
    1st construction phase: Magnus-Poser-Straße to Schenkstraße
    2nd construction phase: Schenkstraße to Charlottenstraße

2x Dornburger Straße

  • Type: Half-sided closure + sidewalk closure
  • Location: between Nordschule and An der Eule
  • Duration: until 30.04.2025
  • Reason: Reconstruction of the streetcar catenary system
  • Type: Various closures
  • Location: House number 6
  • Start: 19.06.2024
  • Reason: New house construction
  • Addition: From 06.01.2025 to 31.10.2025, a one-way road (half-sided closure, driving direction into the city) will be set up in the area of Dornburger Straße 6. The closure will be used for loading and unloading and as a construction site facility. Out-of-town traffic will be diverted via Spitzweidenweg and Nollendorfer Straße.

Ernst-Abbe-Platz

  • Duration: until 30.04.2025
  • Reason: Construction work in the track area
  • Details: Crossing facilities for pedestrians will be set up.

Grenzstraße

  • Type: Complete closure
  • Location: Junction with Geraer Straße up to the railroad bridge
  • Duration: until 30.04.2025
  • Reason: Major roadworks
  • Details: A detour will be signposted.

Isserstedter Straße

  • Type: Complete closure
  • Location: from house number 21 to the junction with Zum Ziskauer Tal
  • Duration: The work in the entire district of Lützeroda will last until the end of 2025
  • Reason: Fundamental road expansion
  • Details: The detour will be signposted.

Kahlaische Straße, sidewalk

  • Type: Complete closure
  • Location: At house number 4 in the direction of Sandweg
  • Duration: until 30.01.2025
  • Reason: Demolition work
  • Details: The closure can be bypassed via Sandweg and Felsenkellerstraße. A detour will be signposted.

Church square

  • Type: Traffic restrictions
  • Location: Around the town church
  • Duration: until 30.05.2025
  • Reason: extensive construction work
  • Details: Access to the town church will be guaranteed during the entire construction period. Saalstraße will be fully closed for transit/delivery traffic.

Lessingstraße

  • Type: Complete closure
  • Location: between Fröbelstieg and Max-Wien-Platz
  • Duration: until 31.01.2025
  • Reason: Civil engineering works and construction site transportation
  • Details: The construction site can be bypassed via Helmholtzweg.

Löbdergraben, eastern footpath

  • Type: Complete closure
  • Location: between Steinweg and Lutherplatz
  • Duration: until 28.02.2025
  • Reason: Roadworks and media relocation
  • Details: Pedestrians will be diverted to the opposite sidewalk.

Rudolf-Breitscheid-Straße

  • Type: Complete closure
  • Location: At house numbers 8 - 30
  • Duration: until 24.04.2025
  • Reason: Reconstruction of wastewater sewer

Schroeterstraße

  • Type: Complete closure
  • Location: from Strigelstraße to Forstweg
  • Duration: until 30.05.2025
  • Reason: Fundamental road expansion
  • Details: During the construction period there is no connection to Katharinenstraße.

Wiesenstraße, traffic circle

  • Duration: until 29.11.2025
  • Reason: fundamental redesign
  • Details: Access to Kunitz and the adjacent industrial estate is only possible via Brückenstraße, but not via Wiesenstraße. A wide detour is signposted via Am Anger - Dornburger Straße - Camburger Straße. An emergency footpath to Kunitz and in the direction of Naumburger Straße leads past the roadworks.

Announcements

None

Kategorie
Cookies management panel
This site uses cookies and gives you control over what you want to activate