Dummy link to fix Firefox-Bug: First child with tabindex is ignored

Jena construction site report for the 17th calendar week (20 to 26.04.2026)

17.04.2026

Unless otherwise indicated, you can get past the roadworks on foot and by bike.

New closures / obstructions

Philosophenweg

  • Type: Complete closure
  • Location: Junction with Max-Wien-Platz up to house number 32
  • Duration: 20.04. to 29.05.2026
  • Reason: Replacement of the drinking water pipe
  • Details: The construction site can be passed safely on foot.

Announcements/ notices

Herderstraße

  • Type: Complete closure
  • Location: between Wartburgstraße and Westendstraße
  • Duration: 27.04. to 30.07.2026
  • Reason: Change in power line routing (underground in future)
  • Details: The construction site can be passed safely on foot.

Closures completed

Naumburger Straße 33a - 33b

  • The embossed asphalt has been repaired.

Existing closures

August-Bebel-Straße

  • Type: Complete closure
  • Location: from house number 27a to Botzstraße
  • Duration: until 20.11.2026
  • Reason: fundamental expansion
  • Details: The construction site will be extended to Botzstraße from 16.03.2026. Residents from Wilhelm-Külz-Straße will still be able to access August-Bebel-Straße. A detour is signposted.
    Customers can only reach the Norma supermarket on foot.

Göschwitz station, forecourt

  • Type: Complete closure
  • Duration: until 30.06.2026
  • Reason: Fundamental expansion of the area
  • Details: The construction site can be safely passed on foot in the direction of Göschwitz station. A limited number of bicycle parking spaces will be provided opposite the streetcar stop in the green area. Alternatively, bicycles can also be parked in the western area of the station.

Bernhard-Schultze-Straße

  • Type: Complete closure
  • Duration: until 02.10.2026
  • Reason: fundamental expansion with pipeline and sewer construction
  • Details: The work will be carried out in two construction phases. A detour will be signposted.
    • 1st construction phase: Am Steinborn from Löbichauer Straße to Bernhard-Schultze-Straße
    • 2nd construction phase: Am Steinborn street to Klopfleischstraße

Carl-Zeiss-Platz

  • Type: Complete closure
  • Location: House numbers 12 to 14
  • Duration: until 31.12.2026
  • Reason: Renovation and new construction of the German Optical Museum

Cospedaer Grund

  • Type: Temporary closures
  • Duration: until approx. 30.04.2026
  • Reason: Fiber optic expansion
  • Details: The adjacent properties are accessible during the entire construction period.

2x Dornburger Straße

  • Type: One-way street regulation
  • Location: between Clara-Zetkin-Straße and Scharnhorststraße
  • Duration: until 24.04.2026
  • Reason: Track work
  • Details: The work will be carried out in three construction phases while the streetcar continues to run. Work will begin in the area of Dornburger Straße 36-64, for which the outbound lane from Clara-Zetkin-Straße will have to be closed. Out-of-town traffic will be diverted from Nollendorfer Straße via Camburger Straße. Dornburger Straße will become a one-way street into the city.
  • Type: Various closures
  • Place: Place: House number 6
  • Duration: until 31.10.2026
  • Reason: New house construction
  • Detail: There is a one-way regulation into the city. The cordoned-off area will be used for construction site equipment and loading and unloading. Out of town, the detour is via Spitzweidenweg and Nollendorfer Straße.

Fritz-Reuter-Straße

  • Type: Complete closure
  • Duration: until 21.10.2026
  • Reason: Reconstruction of drinking water, mixed water and electrical pipes
  • Details: The work will be carried out in two construction phases. A detour will be signposted.
    • 1st construction phase: From Kronfeldstraße to Viktor-von-Scheffel-Weg
    • 2nd construction phase: Viktor-von-Scheffel-Weg to Tatzendpromenade, start approx. April 2026

Forstweg (bridge)

  • Type: Complete closure
  • Location: between house numbers 14 to 25
  • Duration: until 20.12.2026
  • Reason: Replacement construction of the bridge
  • Details: The road is only accessible from both directions up to the bridge. Depending on the construction work, there may also be parking and stopping restrictions. A temporary pedestrian bridge will be built. The temporary bridge can be used on foot.

Corridor road

  • Type: Complete closure
  • Duration: until 12.06.2026
  • Reason: Renewal of the asphalt surface
  • Details: The measure will be carried out in 2 construction phases. The closures can be bypassed via the adjacent road network.
    • 2nd construction phase (13.04. to 12.06.2026): From the junction of Schreckenbachweg to the street Am Rosenhang, incl. Maria-Pawlowna-Straße.

University Hospital stop (Erlanger Allee)

  • Type: Closure of one lane inbound and one lane outbound
  • Duration: until 15.06.2026
  • Reason: Renovation work at the stop
  • Details: The surrounding roads are not affected and can still be used. A replacement stop for the streetcar will be set up in the westbound/townbound direction.

Jenertal stop (Stadtrodaer Straße)

  • Type: Closure of one lane
  • Duration: until 23.06.2026
  • Reason: Renovation work at the bus stop
  • Details: The bus stop will be taken out of service during this time. A replacement stop for the streetcar will be set up in the north/city direction. It will still be possible to cross the road on foot.

Kahlaische Straße (sidewalk)

  • Type: Complete closure
  • Location: At house number 1 to 3
  • Duration: until 29.05.2026
  • Reason: Civil engineering works and sidewalk renovation
  • Details: The footpath will be diverted via the adjacent road network.

Lessingstraße

  • Type: Complete closure
  • Location: between Fröbelstieg and Max-Wien-Platz
  • Duration: until 31.12.2026
  • Reason: Civil engineering works and construction site transportation
  • Details: The construction site can be bypassed via Helmholtzweg

Lutherstrasse

  • Type: Closure on one side
  • Location: At house number 149
  • Duration: extended until 24.04.2026
  • Reason: Civil engineering works and material deposits
  • Details: Out of town, the half-sided closure can be bypassed. Inbound traffic will be diverted via Herderstraße / Sickingenstraße. The closure can also be bypassed via Erfurter Straße.

Naumburger Straße

  • Type: Complete closure
  • Location: Jena town exit to the junction with Carl-Orff-Straße Süd
  • Duration: 1st construction phase until 30.11.2026
  • Reason: Comprehensive infrastructure measure (renewal of the road/sidewalks and cycle paths/lines, streetcar extension)
  • Details: The detour is extensive in both directions from Camburg / Rodameuschel via the L1070 to Trotz, from Trotz on the B7 via Bürgel to Jena. The Carl-Orff-Straße Süd junction is passable throughout.
  • More information on the project: jena.de/ausbau-jena-nord(Link is external)

Remderodaer Straße

  • Type: Complete closure
  • Location: between Münchenrodaer Grund and the railroad bridge
  • Duration: until 16.10.2026
  • Reason: Replacement of the drinking water pipeline and road surface renovation
  • Details: A detour will be signposted.

Sankt-Jakob-Straße

  • Type: Complete closure of the southern carriageway
  • Location: between Kritzegraben and Spittelplatz
  • Duration: until 31.12.2026
  • Reason: fundamental expansion of the area
  • Details: People on foot or by bike will be diverted via Philosophenweg in the direction of Sankt-Jakob-Straße. The streets Kritzegraben, Am Planetarium and Sophienstraße can be used without restriction.

Wöllnitz pedestrian bridge

  • Type: Restrictions and closures
  • Location: in the area of Stadtrodaer Straße
  • Duration: until 12.09.2026
  • Reason: Bridge renovation
  • Details: The measure will be carried out in 5 construction phases. In the 4th and 5th sections, the bridge will be closed to pedestrian and cycle traffic.
    • 4th construction phase (13.04. to 26.06.2026): Closure of the outbound lanes, traffic will be diverted to the opposite direction.
    • 5th construction phase (27.06. to 20.09.2026): Closure of the inbound lanes, traffic will be diverted to the opposite direction.