Construction site report for the 22nd calendar week of 2019
Finished construction sites
- Bürgelsche Straße 15: Construction work completed ahead of schedule
- Karl-Liebknecht-Straße: Construction work completed ahead of schedule
New closures
| Where | What | Why | When | Hints |
|---|---|---|---|---|
|
Bernhard-Schultze-Straße |
Complete closure
between Am Steinborn and the junction with Julius-Schaxel-Straße |
Civil engineering work on supply lines |
27.05. to 27.08 |
|
| Dornburger Straße / Scharnhorststraße | Restrictions | Renewal of the road surface in the track area | 27.05. to 08.06. | Crossing and turning over the tracks must be prohibited during the construction period. |
|
Saalstraße |
Complete closure |
Facade inspection at the "Göhre" municipal museum |
29.05. from 10 a.m. to 1 p.m. |
Existing locks
| Where | What | Why | When | Hints |
|---|---|---|---|---|
| Camburger Straße | Half-sided closure | Laying of gas pipes | until 15.06. | During the construction period, traffic in the direction of the city center will remain on Camburger Straße. As last year, northbound traffic will be routed back to Camburger Straße via Spitzweidenweg and Scharnhorststraße. |
| Drosselstraße | Full closure between Jenaprießnitzer Straße and Steingraben | Reconstruction of the gas pipes | until 29.05. | During the closure, the one-way traffic regulation in Steingraben will be lifted. Resident traffic in Steingraben will be regulated by traffic lights at the junction with Karl-Liebknecht-Straße. |
| Am Eisenbahndamm | Narrowing of the road | Laying of a drinking water pipe through the railroad embankment between Landveste and Straße am Eisenbahndamm | until 26.07 | During the construction work, the cycle/walking path will be closed in the area of the construction site at Landveste and diverted in the area of Landveste. There will also be a temporary narrowing of the road Am Eisenbahndamm, especially at times when traffic is lighter, as one of the two left-turn lanes in the direction of Paradiesbrücke (Stadtrodaer Straße) will have to be shortened slightly. |
| Lichtenhainer Oberweg | Full closure between Carl-Zeiss-Promenade and Döbereinerstrasse | until 28.06. |
Detour via the adjacent streets Phillip-Müller-Straße; Döbereinerstraße; Friedrich-Körner-Straße. |
|
| Lutherplatz/ Inselplatz | Closure of approx. 1/3 of the parking lot | Archaeological excavations | until 20.09 | |
| Marktstraße in Lobeda-Altstadt | Closure in sections | Extension of Marktstraße between Marktplatz and Nikolaus-Theiner-Straße and further via Lobdeburgweg between Stadtgraben and Spitzbergstraße | until 27.09. | |
| Maria-Pawlowna-Straße | Closure | Construction work on the district heating pipeline | until 07.06 | Traffic between Naumburger Straße and Schreckenbachweg or Am Rosenhang will be diverted in both directions via Flurweg. |
| Max-Wien-Platz | Restrictions in the area where Kritzegraben joins Philosophenweg | Development of the property at Am Philosophenweg 26 | until mid-2019 | A construction site traffic light regulates the traffic. |
| Mittelstraße | Complete closure | Replacement of the sewer between Otto-Schott-Straße and Kronfeldstraße | until 30.08. | It is possible to drive around the construction site via the adjacent roads. |
| Naumburger Straße / Rautal | Full closure of the Naumburger Straße / Am Steinbach junction | Extension of Naumburger Straße between Camburger Straße and Flurweg |
Large-scale detour via Brückenstraße - Wiesenstraße - Am Anger and back. Despite the barriers in Brückenstraße: Please do not attempt to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority. |
|
| Otto-Schott-Straße | Full closure in two construction phases |
The first construction phase is between Kronfeldstraße and Okenstraße. For drivers, this means
Otto-Schott-Straße only free as far as Okenstraße
Otto-Schott-Straße only free as far as Kronfeldstraße Rautalstraße Full closure between Ottogerd-Mühlmann-Straße and Jägerbergstraße Stopping bans apply directly at the construction site. |
||
| Rautalstraße | Full closure between Ottogerd-Mühlmann-Straße and Jägerbergstraße | Laying of new drinking water pipes | until 29.05. |
Detour via Closewitzer Straße In the fall, the new drinking water pipeline in Rautal will be laid further to Jena in the direction of Closewitz. |
| Schillstraße 1 | Complete closure | Renewal of sewer and house connections | until 31.05. | Traffic will be diverted locally. |
| Schrödingerstr. 8-18 | Half-sided closure | Renovation work on the adjacent building | until 08.11. | |
| Stifterstrasse | Full closure | Laying of a new drinking water pipe | until 31.07. | |
| Am Volksbad | Half-sided closure | Construction of a footpath incl. ancillary facilities at the bus station | until 26.06. | The street Am Volksbad is only accessible from Grietgasse in the direction of Knebelstraße. |
Announcements
| Where | What | Why | When | Hints |
|---|---|---|---|---|
| Löbstedter Straße 45a | Complete closure | Laying of new connections | 03. to 14.06. | The affected stops will be relocated. |
| Stadtrodaer Straße in Lobeda | Full closure in the area of the bridge between Lobeda-Ost and Lobeda-West | Construction of the concrete walkway for the new bridge | 03. to 04.06. |
Traffic will be diverted towards the city center via the traffic circle at the Fair Resort Hotel and Erlanger Allee through Lobeda-Ost. Traffic will be diverted towards the highway via the Lobeda-West access ramp and straight back onto Stadtrodaer Straße. At the junction with Karl-Marx-Allee, traffic must be regulated by roadworks traffic lights. The road closure will be widely signposted. At busy times of the day, there will be temporary obstructions due to the full closure. |