The construction site report for the 25th calendar week
Finished construction sites
-
Schillstraße 1, full closure lifted
-
Löbstedter Straße at Hnr.45a, complete closure lifted, bus stop back at the usual location
New closures
- Half-sided closure of Stadtrodaer Straße,
On Sunday, 16.06.2019, between 07:00 and 17:00, the 29th Jenaer Paradiestriathlon will take place on Stadtrodaer Straße. For this purpose, the lane leading towards Lobeda between the Seidelstraße parking lot and Lobedaer Straße will be closed and traffic will be diverted via the opposite lane. - Westbahnhofstraße between house numbers 2a and 6a
In the course of the retaining wall renovation, it will be necessary to close one side of the retaining wall. The closure is planned for the period from 17.06.2019 to 29.09.2019. If the construction work causes traffic jams for traffic heading into the city, the construction site can be bypassed via Rathenaustraße - Curt-Unckel-Straße - Hainstraße and An der Brauerei.
Existing locks
- Bernhard-Schultze-Straße, full closure between Am Steinborn and the junction with Julius-Schaxel-Straße, reason: civil engineering work on supply lines, until August 27
- Camburger Straße, half-sided closure, reason: laying of gas pipes, until mid-July 2019
During the construction period, road traffic in the direction of the city center will remain on Camburger Straße. Northbound traffic will be routed back to Camburger Straße via Spitzweidenweg and Scharnhorststraße. - Am Eisenbahndamm, narrowing of the road, reason: laying of a drinking water pipeline through the railroad embankment between Landveste and Straße am Eisenbahndamm, until July 26
During the construction work, the cycle/walking path will be closed in the area of the construction site at Landveste and rerouted in the area of Landveste. There will also be a temporary narrowing of the road Am Eisenbahndamm, especially at times when traffic is lighter, as one of the two left-turn lanes in the direction of Paradiesbrücke (Stadtrodaer Straße) will have to be shortened slightly.
-
Lichtenhainer Oberweg, full closure between the Carl-Zeiss-Promenade junction and the Döbereinerstrasse junction, until June 28
Detour via the adjacent streets Phillip-Müller-Straße; Döbereinerstraße; Friedrich-Körner-Straße. - Lutherplatz/ Inselplatz, closure of approx. 1/3 of the parking lot, reason: archaeological excavations, until September 20
- Marktstraße in Lobeda-Altstadt, sectional closure, reason: expansion of Marktstraße between Marktplatz and Nikolaus-Theiner-Straße and further via Lobdeburgweg between Stadtgraben and Spitzbergstraße, until September 27
- Max-Wien-Platz, traffic space restrictions in the area where Kritzegraben joins Philosophenweg, reason: development of the property at Am Philosophenweg 26, until the middle of the year
A construction site traffic light regulates the traffic. -
Mittelstraße, full closure, reason: renewal of the sewer between Otto-Schott-Straße and Kronfeldstraße, until August 30
It is possible to drive around the construction site via the adjacent roads. - Naumburger Straße / Rautal, full closure of the Naumburger Straße / Am Steinbach intersection, reason: expansion of Naumburger Straße between Camburger Straße and Flurweg
The large-scale detour is via Brückenstraße - Wiesenstraße - Am Anger and back.
Despite the barriers in Brückenstraße: Please do not try to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority.
We would like to thank all considerate drivers!
- Rautalstraße, full closure, reason: laying of new drinking water pipes
between Kuithanstraße and Ottogerd-Mühlmann-Straße
Detour via Kuithanstraße, Zitzmann-Straße, Straße and Ottogerd-Mühlmann-Straße or G.-Neumann-Straße.In the fall of this year, this new drinking water pipeline in Rautal will be laid further to the end of Jena in the direction of Closewitz.
- Schrödingerstraße 8-18, one-sided closure, reason: renovation work on the adjacent building, until November 8
- Stifterstraße, complete closure, reason: laying of a new drinking water pipe, until July 31
- Am Volksbad, half-sided closure, reason: construction of a sidewalk including ancillary facilities at the bus station, until June 26
The street Am Volksbad is only accessible from Grietgasse in the direction of Knebelstraße. The detour is signposted.
Announcements
- Hufelandweg
Sectional closure of Hufelandweg between Am Nordfriedhof 7 and Thomas-Mann-Straße from 24.06.2019 to 30.09.2019. A new gas pipeline including service pipes is to be laid in the directional lane leading to Thomas-Mann-Straße. The detour will be via Ricarda-Huch-Weg to Philosophenweg and Kritzegraben. - Engelplatz parking lot
The Engelplatz parking lot will be closed from 21.06.2019 to 28.08.2019 for the preparation and implementation of this year's Kulturarena. - County road K 8 between Isserstedt and Lützeroda
From Monday, 24.06., tree felling and pruning work will be carried out in the Isserstedt forest for about a week.There may be temporary road closures.