Construction site report for the 33rd calendar week
Ended lockdowns
- Max-Wien-Platz
Traffic restrictions at the corner of Kritzegraben have been lifted - Ernst-Abbe-Straße
The road surface has been renewed - passage is now completely possible again. - Closure of Marktstraße in Lobeda-Altstadt
The construction work will be completed on 08.08.2019, from 09.08.2019 the traffic will roll through Marktstraße again - Hugo-Schrade-Straße 55
District heating pipe has been laid - closure lifted - From August 16: Teichgraben finally free again!
New closures
- Complete closure of Schillbachstraße
In the period from 12.08.2019 to 23.09.2019, there will be a complete closure of the roadway for vehicle traffic in the area of Schillbachstraße No. 23 (access from Steiger). Unfortunately, a detour is not possible. The closed area is passable for pedestrians. The closure is necessary in order to renew a domestic drinking water connection. - Westendstrasse 7
From 12.08.2019 to 23.08.2019, Westendstraße will be closed to vehicle traffic in the area of house no. 7. Traffic will be diverted on site and the detour will be signposted. The reason for the closure is the excavation of the road for the renewal of a house connection line
Announcements
Closures for surface course renewal
- Johannes-R.-Becher-Straße: 19.08.2019 to 30.08.2019
- Werner-Seelbenbinder-Straße: 16.09.2019 to 27.09.2019
- Göschwitzer Straße: 30.09.2019 to 18.10.2019
- Stauffenbergstraße: 21.10.2019 to 01.11.2019
Existing locks
- Bernhard-Schultze-Straße, full closure between Am Steinborn and the junction with Julius-Schaxel-Straße,
Reason: civil engineering work on supply lines, until August 27 - Engelplatz, closure of the parking lot,
Reason: Preparation and implementation of the Kulturarena, until August 28 - Lutherplatz, narrowing (closure of the right-hand lane from Angerkreuzung to Saalbahnhofstraße), reason: laying of water pipe, until August 9
The parking lot at Lutherplatz 3 opposite Hotel Schwarzer Bär cannot be used by residents during the entire construction period. It is recommended to use the parking spaces on the east side of the street Am Anger between Steinweg and Angerkreuzung. - Lutherplatz/ Inselplatz, closure of approx. 1/3 of the parking lot, reason: archaeological excavations, until September 20
- Mittelstraße, full closure, reason: renewal of the sewer between Otto-Schott-Straße and Kronfeldstraße, until August 30
It is possible to drive around the construction site via the adjacent roads. - Naumburger Straße / Rautal, full closure, reason: expansion of Naumburger Straße between Camburger Straße and Flurweg
The large-scale detour is via Brückenstraße - Wiesenstraße - Am Anger and back.
Despite the barriers in Brückenstraße: Please do not try to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority. - Rautalstraße, full closure from the "Am Heiligenberg" junction in the direction of Closewitzer Straße, reason: laying of new drinking water pipes
Detour via Kuithanstraße, Zitzmann-Straße, Straße and Ottogerd-Mühlmann-Straße or Gotthard-Neumann-Straße.
In the fall of this year, this new drinking water pipeline is to be laid in the Rautal valley as far as the end of Jena in the direction of Closewitz. - Schrödingerstraße 8-18, one-sided closure, reason: renovation work on the adjacent building, until November 8
- Tatzendpromenade and Magdelstieg, full closure, reason: fundamental renovation of Magdelstiege from Gustav-Fischer-Straße to Tatzendpromenade and Tatzendpromenade from Magdelstieg to Lichtenhainer Straße, until June 2020
The construction project is being carried out in two phases. The 1st construction phase is between Gustav-Fischer-Straße and Bertold-Koch-Platz.
The detour is via Otto-Schott-Straße. - Westbahnhofstraße 2a to 6a, one-sided closure in the area of the retaining wall, reason: retaining wall renovation, until September 29
If there is a traffic jam into the city, the roadworks can be bypassed via Rathenaustraße - Curt-Unckel-Straße - Hainstraße and An der Brauerei.
- Teichgraben, full closure, reason: relocation of drinking water pipe, until August 16
Replacement bus stops: In the Grietgasse area immediately east of Neugasse and between Am Volksbad and Paradiesstraße (wooden platform on the parking lane)
Bus route 16 will be routed from Holzmarkt via Nonnenplan and Kollegiengasse to Leutragraben.
The traffic lights in the Engelplatz area will be adjusted by KSJ.