Construction site report for the 40th calendar week of 2019 (September 30 - October 6)

27.09.2019
  • Am Kieshügel, closure, reason: laying of service pipes, until September 27
  • Neugasse, full closure at house number 6, reason: relocation, September 23
  • Rautalstraße, full closure including the Closewitzer Straße junction up to Jägerbergstraße, until September 28
  • Stadtrodaer Straße, full closure, reason: dismantling of the formwork, main bridge inspection and installation of lighting, until September 27, 18:00
  • Göschwitzer Straße, closures, reason: renewal of surface course, September 30 to October 30
    The construction work is taking place in the area of the Göschwitz industrial estate.

    The old road surface will be removed between 30.09.2019 and 11.10.19. Göschwitzer Straße will become a one-way street from Prüssingstraße to the southern junction of Ernst-Ruska-Ring, which can only be driven on in the direction of Burgau. Two-way traffic will be diverted via Lobedaer Straße and Rudolstädter Straße. The same traffic regulations will apply when the final work on the road construction site is completed - between 21.10.19 and 30.10.2019.

    The surface course will be laid in two consecutive construction phases, each of which will require a full closure of Göschwitzer Straße. Traffic will be diverted in both directions via Lobedaer Straße and Rudolstädter Straße.

    1st construction phase 12.10.2019 to 14.10.2019
    Full closure between the southern junction of Ernst-Ruska-Ring and Fr.- Hundt-Straße.

    2nd construction phase 19.10.2019 to 21.10.2019
    Full closure between the southern junction of Prüssingstraße and Fr.-Hundt-Straße

    Pedestrians and cyclists will not be diverted. They can use the sidewalk along the construction site.

  • Kreuzgasse, closure in the area north of the Florian-Geyer-Weg junction, reason: disconnection of a service line, September 30 to October 4
    Kreuzgasse can be accessed from Juri-Gagarin-Straße as a dead end without a turning point.

    An emergency footpath will remain available for pedestrians, which cyclists can also use to pass the small roadworks.

  • Camburger Straße, half-sided closure between Leipziger Straße and Scharnhorststraße, reason: laying of drinking water pipe, until the end of December
    • Initially, Camburger Straße will be closed on one side from Scharnhorststraße in the direction of the Aral petrol station and traffic will be diverted into the city via Dornburger Straße and Scharnhorststraße.
    • Full closure of the Camburger-Straße / Scharnhorststraße intersection during the fall vacations (October 7 to 19). The detour will be via Dornburger Straße and Nollendorfer Platz in both directions.
  • Löbdergraben 1, half-sided closure, reason: renovation work at the bus stop, until October 4

    The half-side closure will be implemented by means of one-way traffic control in the direction of Teichgraben. Road users who want to drive in the direction of Löbdergraben must drive around the roadworks via Holzmarkt and Grietgasse or Knebelstraße.

  • Lutherplatz/ Inselplatz, closure of approx. 1/3 of the parking lot, reason: archaeological excavations
  • Naumburger Straße / Rautal, full closure, reason: expansion of Naumburger Straße between Camburger Straße and Flurweg
    • The large-scale detour is via Brückenstraße - Wiesenstraße - Am Anger and back.
    • Despite the barriers in Brückenstraße: Please do not try to drive through the residential area! Public and school buses drive through the small streets. "Creeping traffic" would massively obstruct local traffic there. In addition, the sidewalks are partially separated from the carriageway - the safety of school routes has top priority.
  • Rautalstraße, full closure west of the Closewitzer Straße junction up to the entrance to Jena from the direction of Closewitz, reason: laying of new drinking water pipes and renewal of the road surface, until November 29
  • Schrödingerstraße between Bertold-Brecht-Straße and Hugo-Schrade-Straße, closure, reason: road surface renovation, until October 18

    The closure will take place in two construction phases in order to preserve as many parking spaces as possible. During the closure period, traffic will be diverted via H.-Schrade-Straße, the detour will be signposted.

  • Schrödingerstraße 8-18, one-sided closure, reason: renovation work on the adjacent building, until November 8
    (Will be temporarily suspended during the renovation of the road surface).
  • Stadtrodaer Straße, half-side closure, reason: construction of an additional access road to the stadium site from Stadtrodaer Straße, until May 30, 2020

    This new access road is located to the south of the current stadium access road, approximately at the level of the Saale cycle path crossing over the streetcar tracks. In order to create this new access road, it will be necessary to close one side of Stadtrodaer Straße in this new access area several times during the above-mentioned period. The Saale cycle path will also be closed in this area.

    Detour for motorists: It is planned to route traffic via the opposite directional lane during these periods. The necessary crossings across the central reservation of Stadtrodaer Straße have already been constructed.

    Detour for cyclists: A detour will be in place in both directions via Unterdorfstraße near Wöllnitz, Wöllnitzer Straße, Am Stadion to the Saale cycle path at the entrance to the stadium. The traffic light regulations at the crossings of Stadtrodaer Straße will also be adjusted.

  • Tatzendpromenade and Magdelstieg, full closure, reason: fundamental renewal of Magdelstiege from Gustav-Fischer-Straße to Tatzendpromenade and Tatzendpromenade from Magdelstieg to Lichtenhainer Straße, until June 2020
    • The construction project is being carried out in two phases. The 1st construction phase is between Gustav-Fischer-Straße and Bertold-Koch-Platz.
    • The detour is via Otto-Schott-Straße.
  • Westbahnhofstraße 2a to 6a, half-sided closure in the area of the retaining wall, reason: retaining wall renovation, extended until October 18
    • If there is a traffic jam into the city, the roadworks can be bypassed via Rathenaustraße - Curt-Unckel-Straße - Hainstraße and An der Brauerei.
  • Dammstraße, closure , reason: renewal of surface course between Jenzigweg and Georg-Werth-Straße, October 7 to 10
  • Karl-Liebknecht-Straße, traffic restrictions in the area of the Jena-Ost streetcar terminus, reason: a new rectifier substation for the streetcar power supply is being installed using a crane, October 21 and 22.

    Traffic will be diverted alternately over the streetcar tracks. To ensure that the tracks can be driven on safely, an asphalt surface will be laid over the tracks from October 14 to 18.

  • Nollendorfer Straße, full closure between Am Planetarium and Thomas-Mann-Straße, reason: installation of a construction crane, October 9-10
    A bypass via Theo-Neubauer-Straße is possible.
  • Stauffenbergstraße, closure, reason: renewal of the surface course, October 21 to November 1, 2019