Construction site report 21 - 27.02.2022
COMPLETED CONSTRUCTION SITES
Naumburger Strasse 55 - 59
- Work on the house connections completed.
Frauengasse
from house number 14 to the junction with Am Eisenbahndamm
- Work completed
NEW CONSTRUCTION SITES / ROAD CLOSURES
Eichplatz
- Type: Partial closure
- Duration: on Monday, 21.02.2022, 17.00 - 22.00 hrs
- Reason: rally
Grabenring city center
- Type: Obstructions
- Duration: on Monday, 21.02.2022, 19.00 - 21.00 hrs
- Reason: Elevator
EXISTING CONSTRUCTION SITES
"Bridge in front of the Neutor"
- Type: Complete closure
- Duration: until 30.04.2022
- Reason: New construction of the bridge
- Traffic will be diverted as follows
- out of town via Erbertstraße - Ernst-Haeckel-Straße
- into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
- Details: Underpass to Paradies fully closed - detour signposted
Buchenweg
- Type: Half-sided closure
- Location: House number 34
- Duration: until 12.07.2022
- Reason: Construction site installation for the conversion of the adjacent school
- Details: Waiting is compulsory for vehicles meeting in the carriageway area.
Dornburger Straße
- Type: Complete closure
- Location: from the junction with Schützenhofstraße to the junction with An der Eule
- Duration: until 30.06.2022
- Reason: Civil engineering works
- Details: The current closure area extends from Dornburger Straße 105 -135. A detour will be signposted.
Emil-Wölk-Straße (bus stop)
- Type: Half-sided closure
- Location: Karl-Marx-Allee level with Emil-Wölk-Straße (towards the traffic circle)
- Duration: until 31.03.2022
- Reason: New construction of bus stop
- Details: Traffic will be diverted via Stauffenbergstraße.
Hornstraße
- Type: Complete closure
- Duration: until 25.02.2022
- Reason: Renovation of the "Dornröschen" daycare center
- Details: Pedestrians can pass.
Kollegiengasse
- Type: Complete closure
- Location: between Nonneplan and Löbderstraße
- Duration: until 30.04.2022
- Reason: Civil engineering works
- Details: A detour will be signposted. In this context, a search excavation will also be carried out on Eichplatz next to the Neue Mitte.
Jena North
- Type: Complete closure
- Duration: 31.01. - 11.03.2022
- Details: During this period, there will be 3 traffic restrictions at the following locations.
- In Rautal, at the level of the drinking water tank, there will be a full closure. A detour will be signposted.
- Furthermore, the sidewalk area in Closewitzer Straße will be fully closed due to construction work. An emergency pedestrian route will be set up on the road to allow pedestrians to pass safely.
- At the same time, Ottogerd-Mühlmann-Straße will be closed on one side and the adjacent footpath bridge will be fully closed. An emergency pedestrian route will also be set up here and a pedestrian detour will be signposted.
Oberaue
- Type: Complete closure
- Location: House number 20 to the Lichtenhainer bridge
- Duration: until 18.02.2022
- Reason: Work on the high-pressure gas pipeline
- Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.
- We would like to take this opportunity to clearly point out that moving or removing traffic signs and traffic facilities constitutes a dangerous interference with road traffic. The above-mentioned area is controlled. Traffic signs (e.g. detour signs) are for orientation purposes and must remain in place.