The current construction site report for Jena

11.03.2022

Here is the current construction site report for the 11th calendar week of 2022.
Unless otherwise indicated, cyclists and passers-by will pass the roadworks.

Finished roadworks

Road closures in Jena-North

  • In Rautal, at the level of the drinking water tank - no more full closure.
  • Footpaths in Closewitzer Straße fully accessible again.
  • Half-sided closure in Ottogerd-Mühlmann-Straße completed.

New construction sites / closures

Brändströmstraße and Gabelsbergerstraße

  • Type: Complete closure
  • Location: Gabelsbergerstraße and Brändströmstraße intersection area
  • Duration: until 17.06.2022
  • Reason: Renewal of the sewage pipes

Eichplatz

  • Type: Partial closure
  • Duration: on Monday, 07.03.2022, 17.00 - 22.00 hrs
  • Reason: rally

Kollegiengasse

  • Type: New installation of the full closure
  • Location: between Nonnenplan and Löbderstraße
  • Duration: until 30.04.2022
  • Reason: Civil engineering works
  • Details: A detour is signposted.

Existing construction sites

"Bridge in front of the Neutor"

  • Type: Complete closure
  • Duration: until 30.04.2022
  • Reason: New construction of the bridge
  • Traffic will be diverted as follows:
    • out of town via Erbertstraße - Ernst-Haeckel-Straße
    • into the city via Ernst-Haeckel-Straße - Schillerstraße - Teichgraben
  • Details: Underpass to Paradies fully closed - detour signposted

Buchenweg

  • Type: Half-sided closure
  • Location: House number 34
  • Duration: until 12.07.2022
  • Reason: Construction site installation for the conversion of the adjacent school
  • Details: Waiting is compulsory for vehicles meeting in the carriageway area.

Dornburger Straße

  • Type: Complete closure
  • Location: from the junction with Friedrich-Wolf-Straße to the junction with An der Eule
  • Duration: until 30.06.2022
  • Reason: Civil engineering works
  • Details: A detour will be signposted. Pedestrians can pass the construction site safely.

Emil-Wölk-Straße (bus stop)

  • Type: Closure on one side
  • Location: Karl-Marx-Allee at Emil-Wölk-Straße (towards the traffic circle)
  • Duration: until 31.03.2022
  • Reason: New construction of bus stop
  • Details: Traffic will be diverted via Stauffenbergstraße.

Hornstraße

  • Type: Complete closure
  • Duration: until 31.03.2022
  • Reason: Renovation of the "Dornröschen" daycare center
  • Details: Pedestrians can pass.

Karl-Liebknecht-Straße

  • Type: Complete closure
  • Location: House number 34 - 44
  • Duration: until 01.04.2022
  • Reason: Civil engineering works
  • Details: Pedestrians will be diverted to the opposite sidewalk.

Kollegiengasse

  • Type: Complete closure
  • Location: between Nonnenplan and Löbderstraße
  • Duration: until 30.04.2022
  • Reason: Civil engineering works
  • Details: A detour is signposted.

Oberaue

  • Type: Complete closure
  • Location: House number 20 to the Lichtenhainer bridge
  • Duration: until 31.03.2022
  • Reason: Work on the high-pressure gas pipeline
  • Details: The running hall and adjacent sports fields can be accessed. Access in the direction of Lichtenhainer Brücke is not possible. A corresponding detour for pedestrians and cyclists is signposted.

Schützenhofstraße

  • Type: Half-sided closure
  • Location House number 74-78
  • Duration: until 01.07.2022
  • Reason: Construction site installation for the conversion of the adjacent apartment block
  • Details: Pedestrians can pass safely.

Announcements

Blochmannstraße

  • Type: Complete closure
  • Duration: 21.03. - 17.06.2022
  • Reason: Renewal of the supply lines