Construction site report 19th week (09. - 15.05.2022)
Here is the current roadworks report for the 19th calendar week of 2022.
Unless otherwise stated, cyclists and pedestrians will pass the roadworks.
New construction site
Am Steinborn
- Type: Closure on one side
- Location: House number 35
- Duration: 09 - 27.05.2022
- Reason: Reconstruction of apartment block
- Details: Pedestrians can pass the closure.
Camburger Street
- Type: Sidewalk closure
- Location: House number 84
- Duration: 09 - 13.05.2022
- Reason: Construction work on an electronic billboard
- Details: Pedestrians and cyclists will be guided to the opposite sidewalk at safe crossing points in advance.
Kochstraße
- Type: Complete closure
- Location: House number 4 to the junction with Forstweg
- Duration: 09.05. - 31.07.2022
- Reason: Civil engineering works
- Details: Access to the daycare center and day clinic is possible from Westbahnhofstraße
Pedestrian bridge Wöllnitz
- Type: Complete closure
- Duration: 09 - 10.05.2022
- Reason: Replacement of the floor covering
- Details: Pedestrians and cyclists must use the traffic lights at Wöllnitz during the closure period.
Finished construction sites
Bachstraße
- Demonstration has taken place.
Traffic circle
Alexander-Puschkin-Platz
- Traffic circle is open again from 06.05.2022, 18:00 hrs
"Bridge in front of the Neutor"
- Complete closure has been lifted.
Naumburger Straße
- Accident has been repaired.
Nollendorfer Straße
- Construction work has been completed.
Sophienstraße
- Street festival is finished.
Stadtrodaer Straße
- 32nd Duathlon has taken place.
Existing construction sites
Blochmannstraße
- Type: Complete closure
- Duration: until 17.06.2022
- Reason: Renewal of the supply lines
- Details: A detour will be set up on site.
Brändströmstraße and Gabelsbergerstraße
- Type: Complete closure
- Location: Gabelsbergerstraße and Brändströmstraße intersection area
- Duration: until 17.06.2022
- Reason: Renewal of the sewer pipes
- Details: Brändströmstraße Hnr. 13 to 20 - coming from Karl-Günther-Straße - will be signposted as a dead end. The lower part of Brändströmstraße is required as a storage area. Pedestrians can pass the construction site safely.
Buchenweg
- Type: Half-sided closure
- Location: House number 34
- Duration: until 12.07.2022
- Reason: Construction site installation for the conversion of the adjacent school
- Details: Waiting is compulsory for vehicles meeting in the carriageway area.
Dorfstraße (Jena Wogau)
- Type: Complete closure in 3 construction phases
- Duration: until 29.07.2022
- 1st construction phase: Dorfstraße between the Wilhelm-Hauff-Weg / Dorfstraße / Im Tiefen Weg intersection
- 2nd construction phase: Dorfstraße in the area of the fork in Tiefen Weg
- 3rd construction phase: Dorfstraße from B7 to the junction with Im Tiefen Weg
- Details: Pedestrians can pass the closures safely.
Dornburger Straße
- Type: Complete closure
- Location: from the junction with Friedrich-Wolf-Straße to the junction with An der Eule
- Duration: until 30.06.2022
- Reason: Civil engineering works
- Details: A detour will be signposted. Pedestrians can pass the construction site safely.
Fischergasse
- Type: Complete closure
- Location: in the direction of Löbdergraben
- Estimated duration: until 13.05.22
- Details: Bypass via Am Eisenbahndamm. Detour is signposted.
Pedestrian tunnel under the Saalebahn
- Type: Complete closure
- Location: at the level of An der Brauerei
- Estimated duration: until 13.05.22
- Details: Diversion via Paradiesbahnhof or Mühlenstraße
Gerbergasse
- Type: Closure of residents' parking lot
- Start: 25.04.2022
- Reason: Construction site installation
- Details: Alternative residents' parking spaces have been set up in Wiesenstraße from the Am Saaleufer access road. These can be used immediately.
Hornstraße
- Type: Complete closure
- Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
- Start: until 13.05.2022
- Reason: Work on the road and footpath
- Details: Pedestrians will be provided with a sidewalk for safe passage
Oberaue
- Type: Complete closure
- Location: From the Saaleeingang Ernst-Abbe-Sportfeld to just before the Lichtenhainer Brücke bridge
- Start: until 31.03.2023
- Reason: Work on the stadium grandstand
- Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists will be signposted.
Schützenhofstraße
- Type: Closure on one side
- Location: House number 74-78
- Duration: until 01.07.2022
- Reason: Construction site installation for the conversion of the adjacent apartment block
- Details: Pedestrians can pass safely.
Weigelstraße
- Type: Half-sided closure
- Location: in the direction of Rathausgasse
- Probable duration: until 13.05.22
Ziegenhainer Straße
- Type: Full closure
- Place: House number 7a
- Start: until 31.12.2022
- Reason: New house construction
- Details: Access to adjacent properties towards Burgweg is possible. Passers-by can pass the construction site.
Announcements
Am Steinbach level crossing
- Type: Traffic obstruction
- Start: 17 - 18.05.2022
- Reason: Marking work
- Details: Traffic obstructions may occur at certain points.
Dornburger Straße
- Type: Complete closure
- Location: At the Nordschule bus stop
- Start: 16 - 27.05.2022
- Reason: Repair work in the track area
- Details: Traffic will be diverted via Camburger Straße. Access from the direction of Nollendorfer Hof is possible up to Dornburger Straße 26. Pedestrians can pass the construction site safely.
Juri-Gagarin-Straße
- Type: Complete closure
- Location: behind the junction with Naumburger Straße
- Start: 16 - 27.05.2022
- Reason: Civil engineering works
- Details: Pedestrians can pass the construction site safely. The detour is via Kreuzgasse - Florian-Geyer-Weg.
Change to the one-way street layout in Unterdorfstraße and Wöllnitzer Oberweg
- Type: Complete closure
- Location: Unterdorfstraße 2
- Duration: 16.05. - 31.12.2022
- Reason: Construction work
- Details: The one-way street layout will be changed in the above-mentioned streets. In Unterdorfstraße, it will then be possible to drive out of the city and in Wöllnitzer Oberweg, it will be possible to drive into the city. Cyclists will be able to ride against the one-way street in Wöllnitzer Oberweg. Signage will be put up at the start of the project to raise road users' awareness.