Construction site report week 40 (03.10. - 09.10.2022)

30.09.2022

Here is the current roadworks report for the 40th calendar week of 2022.

Unless otherwise stated, cyclists and pedestrians will pass the roadworks.

COMPLETED CONSTRUCTION SITES

Library square

  • Fiber optic cables are laid.

Felsenkellerstraße

  • Construction work is finished.

Löbdergraben

  • Media has been laid.

Prüssingstrasse

  • House connections and sewer shafts have been laid.

Wenigenjenaer Ufer

  • Combined sewer has been renewed.

NEW CONSTRUCTION SITES / ROAD CLOSURES

Nikolaus-Theiner-Straße

  • Type: Complete closure
  • Location: House number 19
  • Duration: 30.09. - 08.10.2022
  • Reason: Scaffolding erection
  • Details: Local traffic can bypass the construction site via the adjacent road network.

EXISTING ROADWORKS

Construction work at the final stop in Erlanger Allee / Carolinenstraße

Buchenweg

  • Type: Half-sided closure
  • Location: House number 34
  • Duration: until 12.10.2022
  • Reason: Construction site installation for the conversion of the adjacent school
  • Details: Waiting is mandatory for vehicles meeting in the carriageway area.

Carolinenstrasse

  • Type: Complete closure
  • Duration: until 14.10.2022
  • Reason: Pavement renovation
  • Details: The construction work will be divided into several construction phases so that access for residents/rescue and supply services is guaranteed. A detour will be signposted on site. Pedestrians and cyclists can pass the construction site safely.

Eichplatz (parking lot)

  • Type: Partial closure
  • Duration: until 04.12.2022
  • Reason: Carrying out archaeological investigations in advance of the development of construction site A
  • Details: In order to carry out the work professionally, restrictions on the parking lotare unavoidablefor a period of approx. five months. However, high priority will be given to ensuring that as many parking spaces and pathways as possible are maintained during the work. For this reason, the excavations will be carried out in three successive sections, as shown in the plan below.

    We would also like to point out that the usual main access to Eichplatz via Kollegiengasse will not be available during this period. However, the directly adjacent temporary access road can be used asan alternative to entering the parking lot .In addition, one of the tworamps leadingfrom the parking lot to the "Neue Mitte" willno longer be available. However, the second ramp is still available without restriction.

    The excavation work is usually carried out Monday to Friday from 7 am to 4 pm.

    We will provide up-to-date information on the construction work and any associated restrictions or time changes on the website www.eichplatzareal.de(link is external) .

Eichplatzareal

Engelplatz

  • Type: Half-sided closure
  • Duration: until 07.10.2022
  • Reason: Laying of medium voltage cables for the new library
  • Details: Traffic will be routed in a one-way system in the direction of Schillerstraße

Erlanger Allee

  • Type: Closure of the track bed at the intersection of Platanenstraße
  • Duration: until 22.10.2022
  • Reason: Work on the tracks
  • Details: The emergency room at Lobeda University Hospital can be accessed via the Am Klinikum junction. It is also possible to turn at the Am Klinikum junction to head towards Stadtrodaer Straße. For the time being, the track area at the Kastanienstraße junction is only passable for emergency transports. People on foot can pass the area safely. A detour will be signposted on site.

Forest road

  • Type: Half-sided closure
  • Location: At house number 35a
  • Duration: until 31.12.2022
  • Reason: New construction of a residential building

Gerbergasse

  • Type: Closure of residents' parking lot
  • Start: 25.04.2022
  • Reason: Construction site installation
  • Details: Alternative residents' parking spaces have been set up in Wiesenstraße from the Am Saaleufer access road. These can be used immediately.

Großschwäbhäuser Straße

  • Type: One-way road closure on one side
  • Location: between the junction with Bundestraße 7 and the junction with Hauptstraße
  • Duration: until 28.10.2022
  • Reason: Civil engineering works
  • Details: Traffic can be driven from federal highway 7 in the direction of Hauptstraße using one-way traffic control. In the direction of Bundesstraße, traffic will be routed via the junction below. Pedestrians can pass the roadworks area safely.

Julius-Schaxel-Straße

  • Type: Complete closure
  • Duration: until 31.12.2022
  • Reason: Road expansion incl. pipe laying
  • Details: Pedestrians can pass the construction site safely. There will be 3 construction phases. Construction phases 2 + 3 will not take place until 2023.

Käthe-Kollwitz-Straße

  • Type: Complete closure
  • Location: Lane in the direction of Saalbahnhofstraße and adjacent lanes
  • Duration: until 29.10.2022
  • Reason: Civil engineering works
  • Details: Traffic will be diverted via the adjacent road network

Kochstraße

  • Type: Complete closure
  • Location: House number 4 to the junction with Forstweg
  • Duration: until 28.10.2022
  • Reason: Civil engineering works
  • Details: Access/exit to the daycare center and day clinic is possible from Westbahnhofstraße

Lessingstraße

  • Type: Complete closure
  • Location: House number 1-6
  • Duration: until 23.12.2022
  • Reason: Laying of district heating pipe
  • Details: Pedestrians and cyclists can pass the area safely.

Lobeda-Altstadt - Neulobeda - Drackendorf

  • Type: Restrictions
  • Duration: until approx. 14.10.2022
  • Reason: Civil engineering work to lay fiber optic cable

Eastern Löbdergraben

  • Type: Half-sided closure
  • Location: Height Saalstraße
  • Duration: until 31.10.2022
  • Reason: Installation of a construction site exit
  • Details: Pedestrians can still pass through the area.

Max-Gräfe-Gasse

  • Type: Partial closure
  • Location: Corner of Kreuzgasse
  • Duration: until 31.03.2023
  • Reason: Construction site installation for house conversion
  • Details: The construction site can always be passed. Pedestrians and cyclists can pass the construction site safely.

Naumburger Straße in the Schützenhofstr. / Altenburger Str. area

  • Type: Complete closure
  • Location: Naumburger Str. / Schützenhofstr./Altenburger Str. intersection area
  • Duration: until 17.10.2022
  • Reason:Repair of the district heating pipeline for Jena Nord
  • Details: Traffic will be diverted via Scharnhorststr. / Camburger Str.

Oberaue

  • Type: Complete closure
  • Location: From the Saaleeingang Ernst-Abbe-Sportfeld to just before the Lichtenhainer Brücke bridge
  • Duration: until 31.03.2023
  • Reason: Work on the stadium grandstand
  • Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.

Oberaue from the southern access road to the main access road at Stadtrodaer Straße

  • Type: Complete closure
  • Duration: until 31.12.2022
  • Reason: Fundamental expansion of the access road, expansion and widening of the main cycle path connection
  • Detour: A designated detour route will be set up for cyclists heading into and out of the city. The cycle routes run via Wöllnitzer Straße and Burgauer Weg.
  • Restrictions for bathers accessing Südbad/Schleichersee and the beach bar as well as for adjacent sports facility users: The facilities will be accessible from the main stadium access road via a temporary footpath. This footpath can only be used by pedestrians - cyclists must dismount.
    Guests of the Schleichersee and the adjacent sports facilities as well as the traffic school with cars can use the parking lot in the Oberaue directly next to the main access road. This is only not possible when FC Carl Zeiss Jena is playing at home. A planning board will be set up at the main entrance to the Oberaue so that road users are informed.

Thomas-Münzer-Weg

  • Type: Complete closure
  • Place: House number House number 4
  • Duration: until 30.06.2023
  • Reason: Construction of a residential building
  • Details: The full closure is indicated by means of planning boards from both Jägerbergstraße and Max-Gräfe-Gasse. A wide detour must be taken around the closed area. Pedestrians and cyclists can pass the construction site safely.

Change to the one-way street layout in Unterdorfstraße and Wöllnitzer Oberweg

  • Type: Complete closure
  • Location: Unterdorfstraße 2
  • Duration: until 31.12.2022
  • Reason: Construction work
  • Details: The one-way street layout will be changed in the above-mentioned streets. In Unterdorfstraße, it will then be possible to drive out of the city and in Wöllnitzer Oberweg, it will be possible to drive into the city. Cyclists will be able to ride against the one-way street in Wöllnitzer Oberweg. Signage will be erected at the start of the construction work to raise road users' awareness.

Ziegenhainer Straße

  • Type: Complete closure
  • Place: House number House number 7a
  • Duration: until 31.12.2022
  • Reason: New house construction
  • Details: Properties in the direction of Burgweg can be reached via this road. Pedestrians can pass the construction site safely.

To the Ziskauer valley (Lützeroda)

  • Type: Complete closure
  • Duration: until 21.12.2022
  • Reason : Civil engineering works (sewage; drinking water)
  • Details: A detour will be signposted on site.

ANNOUNCEMENT

Napoleon Battle event

  • Type: extensive closures
  • Location: in the area of Lützeroda and surroundings
  • Duration: 15.10.2022
  • Details: A detour will be signposted on site. If you do not wish to take part in this event, it is recommended to drive around the area. The public bus runs every 2 hours only as far as Cospeda. There will be no shuttle service provided by the organizer.

Ritzetal/ Am Steinborn

  • Type: Complete closure
  • Location: House number 19
  • Duration: 17.10. - 28.10.2022
  • Reason: Pavement renovation
  • Details: A detour will be signposted on site. The bus will not be able to reach the turning point and will travel via Löbichauer Straße and Vor der Gembdenmühle during this time.
Kategorie
Cookies management panel
This site uses cookies and gives you control over what you want to activate