Construction site report 43rd week (October 24 - 30, 2022)
Here is the current roadworks report for the 43rd calendar week of 2022.
Unless otherwise stated, cyclists and pedestrians will pass the roadworks.
FINISHED CONSTRUCTION SITES
Carolinenstraße
- Ceiling renovation is complete.
Engelplatz
- The medium-voltage cables have been laid.
NEW CONSTRUCTION SITES / ROAD CLOSURES
Schützenhofstraße
- Type: Half-sided closure
- Location: Height Hnr. 48 to the junction with Closewitzer Straße
- Duration: 24.10. - 23.12.2022
- Reason: Laying of media
- Details: Pedestrians can pass the construction site safely.
EXISTING CONSTRUCTION SITES
Construction work at the final stop in Erlanger Allee / Carolinenstraße
- Type: Complete closure
- Duration: until 16.12.2022
- Details: Any timetable changes to the rail replacement service can be found at www.nahverkehr-jena.de/fahrplan.(link is external) A detour for individual traffic is not necessary.
Buchenweg
- Type: Half-sided closure
- Location: House number 34
- Duration: until 13.01.2023
- Reason: Construction site installation for the conversion of the adjacent school
- Details: Waiting is compulsory for vehicles meeting in the carriageway area.
Eichplatz (parking lot)
- Type: Partial closure
- Duration: until 04.12.2022
- Reason: Carrying out archaeological investigations in advance of the development of construction site A
- Details: From October 5, 2022, the construction fences will be erected by Kommunalservice Jena and thus the third partial area (approx. 35 parking spaces) is now closed. The legally binding no parking signs for the affected areas will be put up immediately.
The path connection via the stairs to Johannisstraße will be maintained. The main access to Eichplatz via Kollegiengasse is still not available. However, the directly adjacent temporary access road can be used as an alternative to entering the parking lot.
The excavation work is usually carried out Monday to Friday from 7 am to 4 pm.
Work that may cause noise nuisance for residents will be limited to breaking up the asphalt and removing the topsoil and, at the end of the work, backfilling and consolidating the surfaces to be resealed.
surfaces to be resealed. The TLDA is currently planning its excavations in such a way that all the trees in excavation section 3 will be preserved. The excavation work is on schedule and, according to current planning, should be completed at the beginning of December.We will provide up-to-date information on the construction work and any associated restrictions or time changes on the website www.eichplatzareal.de(link is external) .

Erlanger Allee
- Type: Closure of the track bed at the Platanenstraße junction
- Duration: until 28.10.2022
- Reason: Work on the tracks
- Details: The emergency room at Lobeda University Hospital can be accessed via the Am Klinikum junction. It is also possible to turn at the Am Klinikum junction to head towards Stadtrodaer Straße. For the time being, the track area at the Kastanienstraße junction is only passable for emergency transports. People on foot can pass the area safely. A detour will be signposted on site.
Forest road
- Type: Half-sided closure
- Location: At house number 35a
- Duration: until 31.12.2022
- Reason: New construction of a residential building
Gerbergasse
- Type: Closure of residents' parking lot
- Start: 25.04.2022
- Reason: Construction site installation
- Details: Alternative residents' parking spaces have been set up in Wiesenstraße from the Am Saaleufer access road. These can be used immediately.
Großschwäbhäuser Straße
- Type: One-way road closure on one side
- Location: between the junction with Bundestraße 7 and the junction with Hauptstraße
- Duration: until 28.10.2022
- Reason: Civil engineering works
- Details: Traffic can be driven from federal highway 7 in the direction of Hauptstraße using one-way traffic control. In the direction of Bundesstraße, traffic will be routed via the junction below. Pedestrians can pass the roadworks area safely.
Jägerbergstraße
- Type: Complete closure
- Duration: until 11.11.2022
- Reason: Renewal of the road surface
- Details: Heavy traffic will be widely diverted via the Bundesstraße 7. Car traffic will be diverted via Rautal and Closewitz.
Julius-Schaxel-Straße
- Type: Complete closure
- Duration: until 31.12.2022
- Reason: Road expansion incl. pipe laying
- Details: Pedestrians can pass the construction site safely. There will be 3 construction phases. Construction phases 2 + 3 will not take place until 2023.
Käthe-Kollwitz-Straße
- Type: Complete closure
- Location: Lane in the direction of Saalbahnhofstraße and adjacent lanes
- Duration: until 29.10.2022
- Reason: Civil engineering works
- Details: Traffic will be diverted via the adjacent road network
Kochstraße
- Type: Complete closure
- Location: House number 4 to the junction with Forstweg
- Duration: until 28.10.2022
- Reason: Civil engineering works
- Details: Access/exit to the daycare center and day clinic is possible from Westbahnhofstraße
Lessingstraße
- Type: Complete closure
- Location: House number 1-6
- Duration: until 23.12.2022
- Reason: Laying of district heating pipe
- Details: Pedestrians and cyclists can pass the area safely.
Lobeda-Altstadt - Neulobeda - Drackendorf
- Type: Restrictions
- Duration: until approx. 31.12.2022
- Reason: Civil engineering work to lay fiber optic cable
Eastern Löbdergraben
- Type: Half-sided closure
- Location: At Saalstraße level
- Duration: until 31.10.2022
- Reason: Installation of a construction site exit
- Details: Pedestrians can still pass through the area.
Max-Gräfe-Gasse
- Type: Partial closure
- Location: Corner of Kreuzgasse
- Duration: until 31.03.2023
- Reason: Construction site installation for house conversion
- Details: The construction site can always be passed. Pedestrians and cyclists can pass the construction site safely.
Oberaue
- Type: Complete closure
- Location: From the Saaleeingang Ernst-Abbe-Sportfeld entrance to just before the Lichtenhainer Brücke bridge
- Duration: until 31.03.2023
- Reason: Work on the stadium grandstand
- Details: The Lichtenhain Bridge is not affected by the closure. A detour for pedestrians and cyclists is signposted.
Oberaue from the southern access road to the main access road at Stadtrodaer Straße
- Type: Complete closure
- Duration: until 31.12.2022
- Reason: Fundamental expansion of the access road, expansion and widening of the main cycle path connection
- Detour: A designated detour route will be set up for cyclists heading into and out of the city. The cycle routes run via Wöllnitzer Straße and Burgauer Weg.
- Restrictions for bathers accessing Südbad/Schleichersee and the beach bar as well as for adjacent sports facility users: The facilities will be accessible from the main stadium access road via a temporary footpath. This footpath can only be used by pedestrians - cyclists must dismount.
Guests of the Schleichersee and the adjacent sports facilities as well as the traffic school with cars can use the parking lot in the Oberaue directly next to the main access road. This is only not possible when FC Carl Zeiss Jena is playing at home. A planning board will be set up at the main entrance to the Oberaue so that road users are informed.
Ritzetal / Am Steinborn
- Type: Complete closure
- Duration: until 28.10.2022
- Reason: Renewal of the road surface
- Details: The bus will not be able to access the turning point and will travel via Löbichauer Straße and Vor der Gembdenmühle during this time.
Roland-Ducke-Weg
- Type: Half-sided closure
- Duration: until 28.10.2022
- Reason: Laying of a new district heating pipeline
Stadtrodaer Straße
- Type: Closure on one side
- Duration: until 11.11.2022
- Location: Between Goldberg tunnel and Bäckergasse traffic lights
- Reason: Construction of the cycle bypass
Thomas-Münzer-Weg
- Type: Full closure
- Location: House number 4
- Duration: until 30.06.2023
- Reason: Construction of a residential building
- Details: The full closure is indicated by means of planning boards from both Jägerbergstraße and Max-Gräfe-Gasse. A wide detour must be taken around the closed area. Pedestrians and cyclists can pass the construction site safely.
Change to the one-way street layout in Unterdorfstraße and Wöllnitzer Oberweg
- Type: Complete closure
- Location: Unterdorfstraße 2
- Duration: until 31.12.2022
- Reason: Construction work
- Details: The one-way street layout will be changed in the above-mentioned streets. In Unterdorfstraße, it will then be possible to drive out of the city and in Wöllnitzer Oberweg, it will be possible to drive into the city. Cyclists will be able to ride against the one-way street in Wöllnitzer Oberweg. Signage will be put up at the start of the construction work to raise road users' awareness.
Wöllnitz and Ammerbach
- Type: temporary restrictions
- Duration: until approx. 28.02.2023
- Reason: Civil engineering work to lay fiber optic cable
Ziegenhainer Straße
- Type: Complete closure
- Place: House number 7a
- Duration: until 31.12.2022
- Reason: New house construction
- Details: Properties in the direction of Burgweg can be reached via this road. Pedestrians can pass the construction site safely.
To the Ziskauer valley (Lützeroda)
- Type: Complete closure
- Duration: until 21.12.2022
- Reason : Civil engineering works (sewage; drinking water)
- Details: A detour will be signposted on site.
ANNOUNCEMENT
Closure of the Goldberg tunnel for cyclists
- Details: From mid-November, the Goldberg Tunnel will be undergoing emergency renovation work for 6 weeks with a full closure. After that, it will only be open to pedestrians. A temporary cycle path will be set up for cyclists along Stadtrodaer Straße to the Bäckergasse traffic lights. This situation will continue until the tunnel is completely rebuilt, for which planning has begun.
Fürstengraben
- Type: One-sided closure
- Duration: from the 44th calendar week for approx. 4 weeks
- Reason: Laying of media