Short closure of the Am Anger road and Camsdorfer Brücke bridge
On Tuesday, 09.06.2020, there will be a traffic interruption in the street Am Anger between the Anger junction and the Steinweg junction for about 15 minutes from 22:00. Afterwards - at around 23:00 - the Camsdorfer Brücke bridge will be closed for around 15 minutes from Camsdorfer Ufer in the direction of the Am Anger junction. Traffic will be diverted locally by the police on site.
During the closure period, a drainage pipe will be laid for the excavation pit to be constructed at the Inselplatz construction site. The pipe will be laid via a prepared pipe bridge over the roadway.